OPTIMASI BIAYA DAN WAKTU PROYEK KONSTRUKSI DENGAN PENAMBAHAN JAM KERJA (LEMBUR) DIBANDINGKAN DENGAN PENAMBAHANTENAGA KERJA MENGGUNAKAN METODE TIME COST TRADE OFF

Main Authors: Septian, Pratama, Muhammad, Fauzi, Samsul, Bahri
Format: BookSection PeerReviewed Book
Bahasa: eng
Terbitan: UNIB Press
Subjects:
Online Access: http://repository.unib.ac.id/20521/1/31%20CEBEC%202019%2C%20OPTIMASI%20BIAYA%20DAN%20WAKTU%20PROYEK%20KONSTRUKSI%20DENGAN%20PENAMBAHAN%20JAM%20KERJA%20%28LEMBUR%29%20DIBANDINGKAN%20DENGAN%20PENAMBAHANTENAGA%20KERJA%20MENGGUNAKAN%20METODE%20TIME%20COST%20TRADE%20OFF.pdf
http://repository.unib.ac.id/20521/