OPTIMASI BIAYA DAN WAKTU PROYEK KONSTRUKSI DENGAN PENAMBAHAN JAM KERJA (LEMBUR) DIBANDINGKAN DENGAN PENAMBAHANTENAGA KERJA MENGGUNAKAN METODE TIME COST TRADE OFF
Main Authors: | Septian, Pratama, Muhammad, Fauzi, Samsul, Bahri |
---|---|
Format: | BookSection PeerReviewed Book |
Bahasa: | eng |
Terbitan: |
UNIB Press
|
Subjects: | |
Online Access: |
http://repository.unib.ac.id/20521/1/31%20CEBEC%202019%2C%20OPTIMASI%20BIAYA%20DAN%20WAKTU%20PROYEK%20KONSTRUKSI%20DENGAN%20PENAMBAHAN%20JAM%20KERJA%20%28LEMBUR%29%20DIBANDINGKAN%20DENGAN%20PENAMBAHANTENAGA%20KERJA%20MENGGUNAKAN%20METODE%20TIME%20COST%20TRADE%20OFF.pdf http://repository.unib.ac.id/20521/ |
Internet
http://repository.unib.ac.id/20521/1/31%20CEBEC%202019%2C%20OPTIMASI%20BIAYA%20DAN%20WAKTU%20PROYEK%20KONSTRUKSI%20DENGAN%20PENAMBAHAN%20JAM%20KERJA%20%28LEMBUR%29%20DIBANDINGKAN%20DENGAN%20PENAMBAHANTENAGA%20KERJA%20MENGGUNAKAN%20METODE%20TIME%20COST%20TRADE%20OFF.pdfhttp://repository.unib.ac.id/20521/
Lokasi
Koleksi | Repository Universitas Bengkulu |
---|---|
Gedung | UPT Perpustakaan Universitas Bengkulu |
Institusi | Universitas Bengkulu |
Kota | KOTA BENGKULU |
Provinsi | BENGKULU |
Kontak | Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini. |