OPTIMASI BIAYA DAN WAKTU PROYEK KONSTRUKSI DENGAN PENAMBAHAN JAM KERJA (LEMBUR) DIBANDINGKAN DENGAN PENAMBAHAN TENAGA KERJA MENGGUNAKAN METODE TIME COST TRADE OFF
Main Authors: | Pratama, Septian, Muhammad, Fauzi, Samsul, Bahri |
---|---|
Format: | Thesis NonPeerReviewed Archive |
Bahasa: | eng |
Terbitan: |
, 2019
|
Subjects: | |
Online Access: |
http://repository.unib.ac.id/20270/1/skripsi%20SEPTIAN%20PRATAMA.pdf http://repository.unib.ac.id/20270/ |