OPTIMASI BIAYA DAN WAKTU PROYEK KONSTRUKSI DENGAN PENAMBAHAN JAM KERJA (LEMBUR) DIBANDINGKAN DENGAN PENAMBAHAN TENAGA KERJA MENGGUNAKAN METODE TIME COST TRADE OFF

Main Authors: Pratama, Septian, Muhammad, Fauzi, Samsul, Bahri
Format: Thesis NonPeerReviewed Archive
Bahasa: eng
Terbitan: , 2019
Subjects:
Online Access: http://repository.unib.ac.id/20270/1/skripsi%20SEPTIAN%20PRATAMA.pdf
http://repository.unib.ac.id/20270/