ANALISIS FAKTOR-FAKTOR KETERLAMBATAN PELAKSANAAN PEKERJAAN RANCANG BANGUN (DESIGN AND BUILD) TERHADAP KINERJA WAKTU (Studi Pada Proyek Menara Bni)

Main Author: GINANJAR, YUSUP
Format: Thesis NonPeerReviewed Book
Bahasa: ind
Terbitan: , 2020
Subjects:
Online Access: http://repository.mercubuana.ac.id/53424/1/1.%20Cover%20OK.pdf
http://repository.mercubuana.ac.id/53424/2/2.%20Abstrak%20OK.pdf
http://repository.mercubuana.ac.id/53424/3/3.%20Lembar%20Pernyataan%20OK.pdf
http://repository.mercubuana.ac.id/53424/4/4.%20Lembar%20Pengesahan%20OK.pdf
http://repository.mercubuana.ac.id/53424/5/5.%20Kata%20Pengantar%20OK.pdf
http://repository.mercubuana.ac.id/53424/6/6.%20Daftar%20Isi%20OK.pdf
http://repository.mercubuana.ac.id/53424/7/7a.%20Daftar%20Tabel%20OK.pdf
http://repository.mercubuana.ac.id/53424/8/7b.%20Daftar%20Gambar%20OK.pdf
http://repository.mercubuana.ac.id/53424/9/7c.%20Daftar%20Lampiran%20OK.pdf
http://repository.mercubuana.ac.id/53424/10/8.%20BAB%201%20OK.pdf
http://repository.mercubuana.ac.id/53424/11/9.%20BAB%202%20OK.pdf
http://repository.mercubuana.ac.id/53424/12/10.%20BAB%203%20OK.pdf
http://repository.mercubuana.ac.id/53424/13/11.%20BAB%204%20OK.pdf
http://repository.mercubuana.ac.id/53424/14/12.%20BAB%205%20OK.pdf
http://repository.mercubuana.ac.id/53424/15/13.%20Daftar%20Pustaka%20OK.pdf
http://repository.mercubuana.ac.id/53424/16/14.%20Lampiran.pdf
http://repository.mercubuana.ac.id/53424/
ctrlnum 53424
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://repository.mercubuana.ac.id/53424/</relation><title>ANALISIS FAKTOR-FAKTOR KETERLAMBATAN PELAKSANAAN PEKERJAAN RANCANG BANGUN (DESIGN AND BUILD) TERHADAP KINERJA WAKTU (Studi Pada Proyek Menara Bni)</title><creator>GINANJAR, YUSUP</creator><subject>022.3 Buildings/Bangunan</subject><subject>069.22 Planning for Buildings/Merencanakan Bangunan</subject><subject>620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan</subject><subject>624 Civil Engineering/Teknik Sipil</subject><subject>624.9 Building, Structure, and Installation/Bangunan, Struktur, dan Instalasi</subject><subject>690 Buildings/Teknik Bangunan</subject><subject>690.1 Structural Elements/Struktur Bahan Dasar Teknik Bangunan</subject><subject>690.1-690.9 Standard Subdivisions of Planning, Anaysis, Engineering Design/Subdivisi Standar Dari Perencanaan, Analisa dan Teknik Bangunan</subject><description>Construction Projects is one form of activity that takes place in a limited period of time, with certain resources, to achieve results in the form of buildings or infrastructure. Construction projects involve contractors, project owners, planning consultants and supervisory consultants that are interrelated in a work agreement called a contract. And project delays often occur in construction projects, one of which is the Menara BNI Project located in Central Jakarta. Project undertaken by PT. PP (Persero) Tbk. Delay is one of the obstacles for development because the time of completion is not in accordance with what has been stipulated in the employment contract document. Which results in an increase in the time of completion of the project that has been planned and listed in the contract document that has been agreed by both parties namely the first and second parties. There are many factors that cause delays, for this reason a study of the factors causing the delay was conducted. The purpose of this study was to obtain any factors that caused delays in construction projects and the dominant factors that caused the project delay. The research method used in this study is quantitative descriptive by determining research variables based on previous journals. Supported by the distribution of phase 1 questionnaires distributed to 3 experts and stage 2 questionnaires distributed to 40 respondents. Questionnaires were distributed in the Menara BNI project environment with contractor staff respondents on the BNI Tower project. The questionnaire analysis was assisted by the SPSS program. The analysis used is Descriptive Statistics Analysis, Validity Test, Reliability Test, Normality Test, T Test, F Test, Determination Coefficient, and Residual Test. From this study, the factors that cause delays based on multiple linear regression analysis can be the most dominant factor in the delay of the Central Jakarta Tower BNI Project, namely building material factors, labor factors, contract factors, financial factors, design changes or methods, time factor and work control.&#xD; Keywords: construction, time delay performance, questionnaire, SPSS, design and build&#xD; &#xD; Proyek Konstruksi merupakan salah satu bentuk kegiatan yang berlangsung dalam&#xD; jangka waktu terbatas, dengan sumber daya tertentu, untuk mencapai hasil dalam&#xD; bentuk bangunan atau infrastruktur. Proyek konstruksi melibatkan kontraktor, pemilik&#xD; proyek, konsultan perencana dan konsultan pengawas yang saling terkait dalam sebuah&#xD; perjanjian kerja yang disebut kontrak. Dan keterlambatan proyek sering terjadi dalam&#xD; proyek konstruksi, salah satunya pada Proyek Menara BNI yang terletak di Jakarta&#xD; Pusat. Proyek yang dikerjakan oleh PT. PP (Persero) Tbk. Keterlambatan merupakan&#xD; salah satu kendala bagi pembangunan karena waktu penyelesaian tidak sesuai dengan yang&#xD; telah ditetapkan pada dokumen kontrak pekerjaan. Yang mengakibatkan bertambahnya waktu&#xD; pelaksanaan penyelesaian proyek yang telah direncanakan dan tercantum dalam dokumen&#xD; kontrak yang telah disetujui kedua belah pihak yaitu pihak pertama dan kedua. Banyak faktorfaktor&#xD; yang menyebabkan terjadinya keterlambatan, untuk itu dilakukan penelitian terhadap&#xD; faktor-faktor penyebab keterlambatan tersebut. Tujuan penelitian ini adalah untuk&#xD; mendapatkan faktor-faktor apa saja yang menyebabkan keterlambatan proyek konstruksi dan&#xD; faktor dominan yang menjadi penyebab keterlambatan proyek tersebut. Metode Penelitian yang&#xD; di gunakan pada penelitian ini adalah deskriptif kuantitatif dengan menentukan variabel&#xD; penelitian berdasarkan jurnal-jurnal terdahulu. Didukung dengan penyebaran kuisioner tahap&#xD; 1 yang di sebar kepada 3 pakar dan kuisioner tahap 2 yang di sebar kepada 40 responden.&#xD; Kuisioner di sebar di lingkungan proyek Menara BNI dengan responden staff kontraktor pada&#xD; proyek Menara BNI. Analisis kuisioner tersebut dibantu dengan program SPSS. Analisis yang&#xD; di gunakan yaitu Analisis Statistik Deskriptif, Uji Validitas, Uji Realibilitas,Uji Normalitas, Uji&#xD; t, Uji F, Koefisien Determinasi, dan Uji Residual. Dari kajian ini di dapat faktor-faktor&#xD; penyebab keterlambatan berdasarkan analisis regresi linear berganda di dapat faktor paling&#xD; dominan terhadap keterlambatan Proyek Menara BNI Jakarta Pusat ini yaitu faktor bahan&#xD; bangunan,faktor tenaga kerja, faktor kontrak, faktor keuangan, faktor perubahan desain atau&#xD; metode, serta faktor waktu dan kontrol kerja.&#xD; Kata Kunci: konstruksi, keterlambatan kinerja waktu, kuisioner, SPSS, design and build</description><date>2020-01-10</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/53424/1/1.%20Cover%20OK.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/53424/2/2.%20Abstrak%20OK.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/53424/3/3.%20Lembar%20Pernyataan%20OK.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/53424/4/4.%20Lembar%20Pengesahan%20OK.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/53424/5/5.%20Kata%20Pengantar%20OK.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/53424/6/6.%20Daftar%20Isi%20OK.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/53424/7/7a.%20Daftar%20Tabel%20OK.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/53424/8/7b.%20Daftar%20Gambar%20OK.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/53424/9/7c.%20Daftar%20Lampiran%20OK.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/53424/10/8.%20BAB%201%20OK.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/53424/11/9.%20BAB%202%20OK.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/53424/12/10.%20BAB%203%20OK.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/53424/13/11.%20BAB%204%20OK.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/53424/14/12.%20BAB%205%20OK.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/53424/15/13.%20Daftar%20Pustaka%20OK.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/53424/16/14.%20Lampiran.pdf</identifier><identifier> GINANJAR, YUSUP (2020) ANALISIS FAKTOR-FAKTOR KETERLAMBATAN PELAKSANAAN PEKERJAAN RANCANG BANGUN (DESIGN AND BUILD) TERHADAP KINERJA WAKTU (Studi Pada Proyek Menara Bni). S1-Sarjana thesis, Universitas Mercu Buana Jakarta. </identifier><recordID>53424</recordID></dc>
language ind
format Thesis:Thesis
Thesis
PeerReview:NonPeerReviewed
PeerReview
Book:Book
Book
author GINANJAR, YUSUP
title ANALISIS FAKTOR-FAKTOR KETERLAMBATAN PELAKSANAAN PEKERJAAN RANCANG BANGUN (DESIGN AND BUILD) TERHADAP KINERJA WAKTU (Studi Pada Proyek Menara Bni)
publishDate 2020
topic 022.3 Buildings
Bangunan
069.22 Planning for Buildings
Merencanakan Bangunan
620 Engineering and Applied Operations
Ilmu Teknik dan operasi Terapan
624 Civil Engineering
Teknik Sipil
624.9 Building
Structure
and Installation/Bangunan
Struktur
dan Instalasi
690 Buildings
Teknik Bangunan
690.1 Structural Elements
Struktur Bahan Dasar Teknik Bangunan
690.1-690.9 Standard Subdivisions of Planning
Anaysis
Engineering Design/Subdivisi Standar Dari Perencanaan
Analisa dan Teknik Bangunan
url http://repository.mercubuana.ac.id/53424/1/1.%20Cover%20OK.pdf
http://repository.mercubuana.ac.id/53424/2/2.%20Abstrak%20OK.pdf
http://repository.mercubuana.ac.id/53424/3/3.%20Lembar%20Pernyataan%20OK.pdf
http://repository.mercubuana.ac.id/53424/4/4.%20Lembar%20Pengesahan%20OK.pdf
http://repository.mercubuana.ac.id/53424/5/5.%20Kata%20Pengantar%20OK.pdf
http://repository.mercubuana.ac.id/53424/6/6.%20Daftar%20Isi%20OK.pdf
http://repository.mercubuana.ac.id/53424/7/7a.%20Daftar%20Tabel%20OK.pdf
http://repository.mercubuana.ac.id/53424/8/7b.%20Daftar%20Gambar%20OK.pdf
http://repository.mercubuana.ac.id/53424/9/7c.%20Daftar%20Lampiran%20OK.pdf
http://repository.mercubuana.ac.id/53424/10/8.%20BAB%201%20OK.pdf
http://repository.mercubuana.ac.id/53424/11/9.%20BAB%202%20OK.pdf
http://repository.mercubuana.ac.id/53424/12/10.%20BAB%203%20OK.pdf
http://repository.mercubuana.ac.id/53424/13/11.%20BAB%204%20OK.pdf
http://repository.mercubuana.ac.id/53424/14/12.%20BAB%205%20OK.pdf
http://repository.mercubuana.ac.id/53424/15/13.%20Daftar%20Pustaka%20OK.pdf
http://repository.mercubuana.ac.id/53424/16/14.%20Lampiran.pdf
http://repository.mercubuana.ac.id/53424/
contents Construction Projects is one form of activity that takes place in a limited period of time, with certain resources, to achieve results in the form of buildings or infrastructure. Construction projects involve contractors, project owners, planning consultants and supervisory consultants that are interrelated in a work agreement called a contract. And project delays often occur in construction projects, one of which is the Menara BNI Project located in Central Jakarta. Project undertaken by PT. PP (Persero) Tbk. Delay is one of the obstacles for development because the time of completion is not in accordance with what has been stipulated in the employment contract document. Which results in an increase in the time of completion of the project that has been planned and listed in the contract document that has been agreed by both parties namely the first and second parties. There are many factors that cause delays, for this reason a study of the factors causing the delay was conducted. The purpose of this study was to obtain any factors that caused delays in construction projects and the dominant factors that caused the project delay. The research method used in this study is quantitative descriptive by determining research variables based on previous journals. Supported by the distribution of phase 1 questionnaires distributed to 3 experts and stage 2 questionnaires distributed to 40 respondents. Questionnaires were distributed in the Menara BNI project environment with contractor staff respondents on the BNI Tower project. The questionnaire analysis was assisted by the SPSS program. The analysis used is Descriptive Statistics Analysis, Validity Test, Reliability Test, Normality Test, T Test, F Test, Determination Coefficient, and Residual Test. From this study, the factors that cause delays based on multiple linear regression analysis can be the most dominant factor in the delay of the Central Jakarta Tower BNI Project, namely building material factors, labor factors, contract factors, financial factors, design changes or methods, time factor and work control. Keywords: construction, time delay performance, questionnaire, SPSS, design and build Proyek Konstruksi merupakan salah satu bentuk kegiatan yang berlangsung dalam jangka waktu terbatas, dengan sumber daya tertentu, untuk mencapai hasil dalam bentuk bangunan atau infrastruktur. Proyek konstruksi melibatkan kontraktor, pemilik proyek, konsultan perencana dan konsultan pengawas yang saling terkait dalam sebuah perjanjian kerja yang disebut kontrak. Dan keterlambatan proyek sering terjadi dalam proyek konstruksi, salah satunya pada Proyek Menara BNI yang terletak di Jakarta Pusat. Proyek yang dikerjakan oleh PT. PP (Persero) Tbk. Keterlambatan merupakan salah satu kendala bagi pembangunan karena waktu penyelesaian tidak sesuai dengan yang telah ditetapkan pada dokumen kontrak pekerjaan. Yang mengakibatkan bertambahnya waktu pelaksanaan penyelesaian proyek yang telah direncanakan dan tercantum dalam dokumen kontrak yang telah disetujui kedua belah pihak yaitu pihak pertama dan kedua. Banyak faktorfaktor yang menyebabkan terjadinya keterlambatan, untuk itu dilakukan penelitian terhadap faktor-faktor penyebab keterlambatan tersebut. Tujuan penelitian ini adalah untuk mendapatkan faktor-faktor apa saja yang menyebabkan keterlambatan proyek konstruksi dan faktor dominan yang menjadi penyebab keterlambatan proyek tersebut. Metode Penelitian yang di gunakan pada penelitian ini adalah deskriptif kuantitatif dengan menentukan variabel penelitian berdasarkan jurnal-jurnal terdahulu. Didukung dengan penyebaran kuisioner tahap 1 yang di sebar kepada 3 pakar dan kuisioner tahap 2 yang di sebar kepada 40 responden. Kuisioner di sebar di lingkungan proyek Menara BNI dengan responden staff kontraktor pada proyek Menara BNI. Analisis kuisioner tersebut dibantu dengan program SPSS. Analisis yang di gunakan yaitu Analisis Statistik Deskriptif, Uji Validitas, Uji Realibilitas,Uji Normalitas, Uji t, Uji F, Koefisien Determinasi, dan Uji Residual. Dari kajian ini di dapat faktor-faktor penyebab keterlambatan berdasarkan analisis regresi linear berganda di dapat faktor paling dominan terhadap keterlambatan Proyek Menara BNI Jakarta Pusat ini yaitu faktor bahan bangunan,faktor tenaga kerja, faktor kontrak, faktor keuangan, faktor perubahan desain atau metode, serta faktor waktu dan kontrol kerja. Kata Kunci: konstruksi, keterlambatan kinerja waktu, kuisioner, SPSS, design and build
id IOS5909.53424
institution Universitas Mercu Buana
institution_id 134
institution_type library:university
library
library Perpustakaan Universitas Mercu Buana
library_id 542
collection Repository Universitas Mercu Buana
repository_id 5909
subject_area Econmics/Ilmu Ekonomi
Communication/Komunikasi
Engineering/Ilmu Teknik
Measurement/Teknik Desain, Pengujian, Pengukuran, Kualitas, Perawatan, Pemeliharaan, Perbaikan
city Jakarta Barat
province DKI JAKARTA
shared_to_ipusnas_str 1
repoId IOS5909
first_indexed 2020-02-06T15:17:32Z
last_indexed 2020-02-06T15:17:32Z
recordtype dc
_version_ 1685794924634570752
score 17.538404