GINANJAR, Y. (2020). ANALISIS FAKTOR-FAKTOR KETERLAMBATAN PELAKSANAAN PEKERJAAN RANCANG BANGUN (DESIGN AND BUILD) TERHADAP KINERJA WAKTU (Studi Pada Proyek Menara Bni).
Chicago Style CitationGINANJAR, YUSUP. ANALISIS FAKTOR-FAKTOR KETERLAMBATAN PELAKSANAAN PEKERJAAN RANCANG BANGUN (DESIGN AND BUILD) TERHADAP KINERJA WAKTU (Studi Pada Proyek Menara Bni). 2020.
MLA CitationGINANJAR, YUSUP. ANALISIS FAKTOR-FAKTOR KETERLAMBATAN PELAKSANAAN PEKERJAAN RANCANG BANGUN (DESIGN AND BUILD) TERHADAP KINERJA WAKTU (Studi Pada Proyek Menara Bni). 2020.
Warning: These citations may not always be 100% accurate.