APA Citation

GINANJAR, Y. (2020). ANALISIS FAKTOR-FAKTOR KETERLAMBATAN PELAKSANAAN PEKERJAAN RANCANG BANGUN (DESIGN AND BUILD) TERHADAP KINERJA WAKTU (Studi Pada Proyek Menara Bni).

Chicago Style Citation

GINANJAR, YUSUP. ANALISIS FAKTOR-FAKTOR KETERLAMBATAN PELAKSANAAN PEKERJAAN RANCANG BANGUN (DESIGN AND BUILD) TERHADAP KINERJA WAKTU (Studi Pada Proyek Menara Bni). 2020.

MLA Citation

GINANJAR, YUSUP. ANALISIS FAKTOR-FAKTOR KETERLAMBATAN PELAKSANAAN PEKERJAAN RANCANG BANGUN (DESIGN AND BUILD) TERHADAP KINERJA WAKTU (Studi Pada Proyek Menara Bni). 2020.

Warning: These citations may not always be 100% accurate.