EVALUASI WAKTU PEKERJAAN TERHADAP BIAYA KONSTRUKSI MENGGUNAKAN METODE PERT DAN CPM (STUDI KASUS: PROYEK PEMBUATAN GEDUNG BELAKANG (TAHAP I) KANTOR PUSAT PDAM KOTA MALANG)
Main Author: | HARJOYUDHANTO, ADITYA TRI |
---|---|
Format: | Thesis NonPeerReviewed Book |
Bahasa: | eng |
Terbitan: |
, 2017
|
Subjects: | |
Online Access: |
http://eprints.umm.ac.id/35391/1/jiptummpp-gdl-adityatrih-49456-1-pendahul-n.pdf http://eprints.umm.ac.id/35391/2/jiptummpp-gdl-adityatrih-49456-2-babi.pdf http://eprints.umm.ac.id/35391/3/jiptummpp-gdl-adityatrih-49456-3-babii.pdf http://eprints.umm.ac.id/35391/4/jiptummpp-gdl-adityatrih-49456-4-babiii.pdf http://eprints.umm.ac.id/35391/ |
Internet
http://eprints.umm.ac.id/35391/1/jiptummpp-gdl-adityatrih-49456-1-pendahul-n.pdfhttp://eprints.umm.ac.id/35391/2/jiptummpp-gdl-adityatrih-49456-2-babi.pdf
http://eprints.umm.ac.id/35391/3/jiptummpp-gdl-adityatrih-49456-3-babii.pdf
http://eprints.umm.ac.id/35391/4/jiptummpp-gdl-adityatrih-49456-4-babiii.pdf
http://eprints.umm.ac.id/35391/
Lokasi
Koleksi | UMM Institutional Repository |
---|---|
Gedung | Perpustakaan Universitas Muhammadiyah Malang |
Institusi | Universitas Muhammadiyah Malang |
Kota | MALANG |
Provinsi | JAWA TIMUR |
Kontak | Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini. |