MEKANISME PRODUK PENSIUN DAN HARI TUA PADA PT. TASPEN (PERSERO) CABANG MALANG

Main Author: SETYOWATI, ERNA
Format: Thesis NonPeerReviewed
Terbitan: , 2012
Subjects:
Online Access: http://eprints.umm.ac.id/18566/
ctrlnum 18566
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://eprints.umm.ac.id/18566/</relation><title>MEKANISME PRODUK PENSIUN DAN HARI TUA PADA PT. TASPEN (PERSERO) CABANG MALANG</title><creator>SETYOWATI, ERNA</creator><subject>HG Finance</subject><subject>HJ Public Finance</subject><description>In writing this final author conducted research to take the title "The mechanism of Pensions and Retirement Products at PT. TASPEN (Limited) Branch Malang".&#xD; This study aims to determine the flow rather than procedures pension payments and to know the advantages and disadvantages of pension payment mechanism used and also to determine the best percentage improvement in PT. Taspen(Persero)BranchMalang.&#xD; The technique of data collection was done by means of documentation and interviews directly to the employee at PT. Taspen (Limited) Branch Malang is the common parts and personnel. While the data analysis technique used is descriptive quantitative discussion is focused on mechanisms of pension payments as well as describing the flow of pension payments, so that the obtained results are consistent with the objectives.</description><date>2012-12-28</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><identifier> SETYOWATI, ERNA (2012) MEKANISME PRODUK PENSIUN DAN HARI TUA PADA PT. TASPEN (PERSERO) CABANG MALANG. Other thesis, University of Muhammadiyah Malang. </identifier><recordID>18566</recordID></dc>
format Thesis:Thesis
Thesis
PeerReview:NonPeerReviewed
PeerReview
author SETYOWATI, ERNA
title MEKANISME PRODUK PENSIUN DAN HARI TUA PADA PT. TASPEN (PERSERO) CABANG MALANG
publishDate 2012
topic HG Finance
HJ Public Finance
url http://eprints.umm.ac.id/18566/
contents In writing this final author conducted research to take the title "The mechanism of Pensions and Retirement Products at PT. TASPEN (Limited) Branch Malang". This study aims to determine the flow rather than procedures pension payments and to know the advantages and disadvantages of pension payment mechanism used and also to determine the best percentage improvement in PT. Taspen(Persero)BranchMalang. The technique of data collection was done by means of documentation and interviews directly to the employee at PT. Taspen (Limited) Branch Malang is the common parts and personnel. While the data analysis technique used is descriptive quantitative discussion is focused on mechanisms of pension payments as well as describing the flow of pension payments, so that the obtained results are consistent with the objectives.
id IOS4109.18566
institution Universitas Muhammadiyah Malang
institution_id 136
institution_type library:university
library
library Perpustakaan Universitas Muhammadiyah Malang
library_id 546
collection UMM Institutional Repository
repository_id 4109
city MALANG
province JAWA TIMUR
repoId IOS4109
first_indexed 2017-03-21T02:44:18Z
last_indexed 2017-03-21T02:44:18Z
recordtype dc
_version_ 1675924231307657216
score 17.538404