PERENCANAAN PEMESANAN KEBUTUHAN BAHAN BAKU UNTUK MENGURANGI STOCK OUT DAN OVER STOCK (Studi Kasus PT Flamboyan Jaya)

Main Author: ANUGRA, PRADICO CHRIS
Format: Thesis NonPeerReviewed
Terbitan: , 2014
Subjects:
Online Access: http://eprints.umm.ac.id/16143/
ctrlnum 16143
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://eprints.umm.ac.id/16143/</relation><title>PERENCANAAN PEMESANAN KEBUTUHAN BAHAN BAKU UNTUK MENGURANGI STOCK OUT DAN OVER STOCK (Studi Kasus : PT Flamboyan Jaya)</title><creator>ANUGRA, PRADICO CHRIS</creator><subject>TJ Mechanical engineering and machinery</subject><description>One problem which faced by PT Flamboyan is about stock or overstock or sometimes experienced lack of raw material (stock out), which influenced its production process. To overcome overstock and stockout in the werehouse, it needs correct raw material planning using Material Requirement Planning (MRP) method.&#xD; There are some phases in this research which is raw material prediction, second phase is deciding MPS (Master Production Schedule) by using Linier Programming software and the final phase is MRP (Material Requirement Planning). Planning method used to state the amount and raw material ordering time using FOQ (Fixed Order Quantity) technique and L-4-L(Lot for Lot) so there wouldn't be over stock or stock out in product.&#xD; Raw material order planning result which are FOQ and L-4-L using Microsoft Excel would be compared with raw material ordering plan before using suggestion method. From data processing, it is found the raw material total ordering by using FOQ (Fixed Order Quantity) and L-4-L (Lot for Lot) for 32.159 kg/month costs IDR 297.932.200,- . Meanwhile for raw material ordering which commonly done by company without using such method for 32.600 kg/month costs IDR 248.325.000,- and experienced lost sale for IDR 52.714.200,- or 8,8%</description><date>2014</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><identifier> ANUGRA, PRADICO CHRIS (2014) PERENCANAAN PEMESANAN KEBUTUHAN BAHAN BAKU UNTUK MENGURANGI STOCK OUT DAN OVER STOCK (Studi Kasus : PT Flamboyan Jaya). Other thesis, University of Muhammadiyah Malang. </identifier><recordID>16143</recordID></dc>
format Thesis:Thesis
Thesis
PeerReview:NonPeerReviewed
PeerReview
author ANUGRA, PRADICO CHRIS
title PERENCANAAN PEMESANAN KEBUTUHAN BAHAN BAKU UNTUK MENGURANGI STOCK OUT DAN OVER STOCK (Studi Kasus : PT Flamboyan Jaya)
title_sub PT Flamboyan Jaya)
publishDate 2014
topic TJ Mechanical engineering and machinery
url http://eprints.umm.ac.id/16143/
contents One problem which faced by PT Flamboyan is about stock or overstock or sometimes experienced lack of raw material (stock out), which influenced its production process. To overcome overstock and stockout in the werehouse, it needs correct raw material planning using Material Requirement Planning (MRP) method. There are some phases in this research which is raw material prediction, second phase is deciding MPS (Master Production Schedule) by using Linier Programming software and the final phase is MRP (Material Requirement Planning). Planning method used to state the amount and raw material ordering time using FOQ (Fixed Order Quantity) technique and L-4-L(Lot for Lot) so there wouldn't be over stock or stock out in product. Raw material order planning result which are FOQ and L-4-L using Microsoft Excel would be compared with raw material ordering plan before using suggestion method. From data processing, it is found the raw material total ordering by using FOQ (Fixed Order Quantity) and L-4-L (Lot for Lot) for 32.159 kg/month costs IDR 297.932.200,- . Meanwhile for raw material ordering which commonly done by company without using such method for 32.600 kg/month costs IDR 248.325.000,- and experienced lost sale for IDR 52.714.200,- or 8,8%
id IOS4109.16143
institution Universitas Muhammadiyah Malang
institution_id 136
institution_type library:university
library
library Perpustakaan Universitas Muhammadiyah Malang
library_id 546
collection UMM Institutional Repository
repository_id 4109
city MALANG
province JAWA TIMUR
repoId IOS4109
first_indexed 2017-03-21T02:43:33Z
last_indexed 2017-03-21T02:43:33Z
recordtype dc
_version_ 1675924222623350784
score 17.538404