PENJADWALAN PRODUKSI FLOW SHOP DENGAN METODE SIMULATED ANNEALING (Studi Kasus pada CV. Sarana Indah Perkasa)
Main Author: | FIRDAUS, MUHAMMAD AINUL |
---|---|
Format: | Thesis NonPeerReviewed |
Terbitan: |
, 2014
|
Subjects: | |
Online Access: |
http://eprints.umm.ac.id/15862/ |
Daftar Isi:
- Production scheduling is very important for companies to be able to minimize the completion time of production, so that the company can deliver the goods in accordance with the specified time and to minimize the costs incurred due to the machine being used can be used optimally. In this company, production scheduling using Simulated Annealing ( SA ) with the help of matlab software is expected to generate a total completion time ( makespan ) is faster than existing scheduling company. SA method based on the process of slowly cooling the steel / metal boiling to reach the minimum value in the function minimization problem. The problem faced by the company is the company has not paid attention in the scheduling of production for each product variant of the package home. It is based on production data in July 2013 and January 2014 that any delay seen from the time of completion of production, so the company had to add 1-2 more days to be able to finish the entire product. By using the SA method produces makespan 39 hours, 6 hours faster than the scheduling is done by the company.