PENJADWALAN PRODUKSI FLOW SHOP DENGAN MIXED INTEGER PROGRAMMING (Studi Kasus PT.Yamaha Musical Products Indonesia)

Main Author: SHOLIKAH, NINA MARATUS
Format: Thesis NonPeerReviewed
Terbitan: , 2014
Subjects:
Online Access: http://eprints.umm.ac.id/15847/
Daftar Isi:
  • Oneway garment was the company that produced various t-shirt of the clothes kind be based on from order that was received. During the time scheduling to only pursuant to priority come of order or First Come First Serve (FCFS). In the process of his production schedules so as to result in the size makespan and idle time. To resolve this problem then was used by the heuristic pour method which aims to determine the proper scheduling and effective in minimizing makespan. Besed on calculations using Heuristic Pour method that provide results value of 36,10 hours with idle time value of 2,31%, and than the FCFS method used the company value of 42,02 hours with idle time value of 2,67%. So efficiency time of makespan is value 5,95 hours.