PENJADWALAN PRODUKSI FLOW SHOP DENGAN MIXED INTEGER PROGRAMMING (Studi Kasus PT.Yamaha Musical Products Indonesia)

Main Author: SHOLIKAH, NINA MARATUS
Format: Thesis NonPeerReviewed
Terbitan: , 2014
Subjects:
Online Access: http://eprints.umm.ac.id/15847/
ctrlnum 15847
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://eprints.umm.ac.id/15847/</relation><title>PENJADWALAN PRODUKSI FLOW SHOP DENGAN MIXED INTEGER PROGRAMMING (Studi Kasus PT.Yamaha Musical Products Indonesia)</title><creator>SHOLIKAH, NINA MARATUS</creator><subject>T Technology (General)</subject><description>Oneway garment was the company that produced various t-shirt of the clothes kind be based on from order that was received. During the time scheduling to only pursuant to priority come of order or First Come First Serve (FCFS). In the process of his production schedules so as to result in the size makespan and idle time. To resolve this problem then was used by the heuristic pour method which aims to determine the proper scheduling and effective in minimizing makespan. Besed on calculations using Heuristic Pour method that provide results value of 36,10 hours with idle time value of 2,31%, and than the FCFS method used the company value of 42,02 hours with idle time value of 2,67%. So efficiency time of makespan is value 5,95 hours.</description><date>2014</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><identifier> SHOLIKAH, NINA MARATUS (2014) PENJADWALAN PRODUKSI FLOW SHOP DENGAN MIXED INTEGER PROGRAMMING (Studi Kasus PT.Yamaha Musical Products Indonesia). Other thesis, University of Muhammadiyah Malang. </identifier><recordID>15847</recordID></dc>
format Thesis:Thesis
Thesis
PeerReview:NonPeerReviewed
PeerReview
author SHOLIKAH, NINA MARATUS
title PENJADWALAN PRODUKSI FLOW SHOP DENGAN MIXED INTEGER PROGRAMMING (Studi Kasus PT.Yamaha Musical Products Indonesia)
publishDate 2014
topic T Technology (General)
url http://eprints.umm.ac.id/15847/
contents Oneway garment was the company that produced various t-shirt of the clothes kind be based on from order that was received. During the time scheduling to only pursuant to priority come of order or First Come First Serve (FCFS). In the process of his production schedules so as to result in the size makespan and idle time. To resolve this problem then was used by the heuristic pour method which aims to determine the proper scheduling and effective in minimizing makespan. Besed on calculations using Heuristic Pour method that provide results value of 36,10 hours with idle time value of 2,31%, and than the FCFS method used the company value of 42,02 hours with idle time value of 2,67%. So efficiency time of makespan is value 5,95 hours.
id IOS4109.15847
institution Universitas Muhammadiyah Malang
institution_id 136
institution_type library:university
library
library Perpustakaan Universitas Muhammadiyah Malang
library_id 546
collection UMM Institutional Repository
repository_id 4109
city MALANG
province JAWA TIMUR
repoId IOS4109
first_indexed 2017-03-21T02:43:28Z
last_indexed 2017-03-21T02:43:28Z
recordtype dc
_version_ 1675924221264396288
score 17.538404