MANAJEMEN WAKTU, BIAYA DAN SDM PROYEK KONSTRUKSI PADA PEMBANGUNAN GEDUNG RUANG KULIAH FIA UNIVERSITAS BRAWIJAYA MALANG DENGAN MENGGUNAKAN METODE PERT DAN PDM ANUGERAH

Main Author: ROZY, FAKHRUR
Format: Thesis NonPeerReviewed
Terbitan: , 2013
Subjects:
Online Access: http://eprints.umm.ac.id/15276/
Daftar Isi:
  • Project managers always want to find a method which can improve quality and control to deal with the number of activities that tend to increase. To improve the quality of planning and control of the building project B FIA UB used a method, and the method used herein is Project Evaluation and Review Technique (PERT) Method and Precedence Diagram Method (PDM) with a software program tool Microsoft Office Project 2003. Completion time planning the optimal project using PERT and PDM is 303 days with a total cost Rp 16,278,036,000.00 (including contractors profit + 10% PPN). From the calculation of the target analyze project completion time T (d), shows that the possibility of the project is completed on time / period of 303 days (normal time) only by 50%. Whereas if the duration / Project Completion period plus 3S (three times the standard deviation) is 303 days + 14.13 = 317.13 days, then it is likely the project is completed on time / period of 317.13 days at 99% (on time).