PERENCANAAN METODE HEURISTIK PRIORITY DISPATCHING RULE PADA PENJADWALAN JOB SHOP UNTUK MEMINIMUMKAN JUMLAH PEKERJAAN YANG TERLAMBAT, BIAYA PRODUKSI, DAN MAKESPAN (Studi kasus C.V. MUSTIKA GROUP Bamjarnegara)
Main Author: | SYA`BANA, AJIB |
---|---|
Format: | Thesis NonPeerReviewed Book |
Bahasa: | eng |
Terbitan: |
, 2006
|
Subjects: | |
Online Access: |
http://eprints.umm.ac.id/12522/1/PERENCANAAN_METODE_HEURISTIK_PRIORITYDISPATCHING_RULE_PADA_PENJADWALAN_JOBSHOP_UNTUK_MEMINIMUMKANJUMLAH_PEKERJAAN_YANG_TERLAMBAT.pdf http://eprints.umm.ac.id/12522/ |