IDENTIFIKASI FAKTOR-FAKTOR RISIKO YANG BERPENGARUH DI TAHAP CONSTRUCTION PADA PROYEK EPC TERHADAP KINERJA WAKTU (Studi Kasus PT. Krakatau Engineering dan PT. Prima Konstruksi Utama)
Main Author: | AYU MAHARANI, SHAFIRA |
---|---|
Format: | Thesis NonPeerReviewed Book |
Bahasa: | ind |
Terbitan: |
, 2014
|
Subjects: | |
Online Access: |
https://eprints.untirta.ac.id/3544/1/Identifikasi%20faktor-faktor%20risiko%20yang%20berpengaruh%20di%20tahap%20xonstruction%20pada%20proyek%20EPC%20Terhadap%20Construction%20pada%20proyek%20EPC.pdf https://eprints.untirta.ac.id/3544/ |