OPTIMASI WAKTU PROYEK DENGAN MENGGUNAKAN CRITICAL PATH METHOD (CPM) PADA PT. LINGGAR MITRATAMA SAKTI (KASUS RENOVASI PT. K-LINE INDONESIA GEDUNG SUMMITMAS II SUDIRMAN LT. 4 JAKARTA)
Main Author: | Audi, Naissa |
---|---|
Format: | Thesis NonPeerReviewed Book |
Bahasa: | eng |
Terbitan: |
, 2019
|
Subjects: | |
Online Access: |
https://eprints.untirta.ac.id/2916/1/OPTIMASI%20WAKTU%20PROYEK%20DENGAN%20MENGGUNAKAN%20CRITICAL%20PATH%20METHOD%20%28CPM%29%20PADA%20PT.%20LINGGAR%20MITRATAMA%20SAKTI%20%28KASUS%20RENOVASI%20PT.%20K-LINE%20INDONESIA%20GEDUNG%20SUMMITMAS%20II%20SUDIRMAN%20LT.%204%20JAKARTA%29.pdf https://eprints.untirta.ac.id/2916/ https://feb.untirta.ac.id/ |
Internet
https://eprints.untirta.ac.id/2916/1/OPTIMASI%20WAKTU%20PROYEK%20DENGAN%20MENGGUNAKAN%20CRITICAL%20PATH%20METHOD%20%28CPM%29%20PADA%20PT.%20LINGGAR%20MITRATAMA%20SAKTI%20%28KASUS%20RENOVASI%20PT.%20K-LINE%20INDONESIA%20GEDUNG%20SUMMITMAS%20II%20SUDIRMAN%20LT.%204%20JAKARTA%29.pdfhttps://eprints.untirta.ac.id/2916/
https://feb.untirta.ac.id/
Lokasi
Koleksi | Repository Universitas Sultan Ageng Tirtayasa |
---|---|
Gedung | Perpustakaan Universitas Sultan Ageng Tirtayasa |
Institusi | Universitas Sultan Ageng Tirtayasa |
Kota | KOTA SERANG |
Provinsi | BANTEN |
Kontak | Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini. |