ANALISIS PENJADWALAN PRODUKSI DENGAN METODE NETWORK PLANNING (CRITICAL PATH METHOD) UNTUK EFEKTIVITAS WAKTU PRODUKSI DNOSE A320 DI PT. DIRGANTARA INDONESIA PERSERO
Main Author: | Muhammad Alfi Resdian, 114010344 |
---|---|
Format: | Thesis NonPeerReviewed Book |
Bahasa: | eng |
Terbitan: |
, 2016
|
Subjects: | |
Online Access: |
http://repository.unpas.ac.id/14656/1/COVER.pdf http://repository.unpas.ac.id/14656/2/Abstrak%20Skripsi.pdf http://repository.unpas.ac.id/14656/3/BAB%20I%20Skripsi.pdf http://repository.unpas.ac.id/14656/4/BAB%20II%20Skripsi.pdf http://repository.unpas.ac.id/14656/5/Daftar%20Pustaka%20Skripsi.pdf http://repository.unpas.ac.id/14656/6/lembar%20pengesahan.pdf http://repository.unpas.ac.id/14656/ |
Internet
http://repository.unpas.ac.id/14656/1/COVER.pdfhttp://repository.unpas.ac.id/14656/2/Abstrak%20Skripsi.pdf
http://repository.unpas.ac.id/14656/3/BAB%20I%20Skripsi.pdf
http://repository.unpas.ac.id/14656/4/BAB%20II%20Skripsi.pdf
http://repository.unpas.ac.id/14656/5/Daftar%20Pustaka%20Skripsi.pdf
http://repository.unpas.ac.id/14656/6/lembar%20pengesahan.pdf
http://repository.unpas.ac.id/14656/
Lokasi
Koleksi | Digital Library Universitas Pasundan Bandung |
---|---|
Gedung | Perpustakaan Universitas Pasundan |
Institusi | Universitas Pasundan |
Kota | BANDUNG |
Provinsi | JAWA BARAT |
Kontak | Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini. |