STUDI PERHITUNGAN SETTING RELE ARUS LEBIH PADA PENYULANG WALET DI GARDU INDUK SEDUDUK PUTIH PALEMBANG
Main Author: | KESUMA JAYA, HENDRO |
---|---|
Format: | Thesis NonPeerReviewed Book |
Bahasa: | eng |
Terbitan: |
, 2014
|
Subjects: | |
Online Access: |
http://eprints.polsri.ac.id/390/1/COVER.pdf http://eprints.polsri.ac.id/390/2/BAB%20I.pdf http://eprints.polsri.ac.id/390/3/BAB%20II.pdf http://eprints.polsri.ac.id/390/4/BAB%20III.pdf http://eprints.polsri.ac.id/390/5/BAB%20IV.pdf http://eprints.polsri.ac.id/390/6/BAB%20V.pdf http://eprints.polsri.ac.id/390/7/DAFTAR%20PUSTAKA.pdf http://eprints.polsri.ac.id/390/ |
Daftar Isi:
- The distribution system in the common power disturbances that can hinder the process of distribution of electric power, therefore it needs the installation of a security that it can secure the disorder, can diketeahui on each feeder in the event of a short circuit, not only cause kontinyunitas disruption of the distribution of power to the load (consumer) but also cause damage to the existing installation. Protection equipment which is used for one feeder overcurrent relays is / Over Current Relay (OCR). To achieve a better state in the power distribution and substation equipment installed on the primary distribution network, it is also necessary to setup security overcurrent relays existing in order to obtain reliability, speed, sensitivity and selectivity. In this final report the calculation of 3-phase short-circuit current and the current settings on Swallow feeders supplied from power transformers (II) 30 MVA at PT. PLN (Persero) substation Seduduk Putih Palembang. After doing the calculations and compare with the security that has been installed in accordance turns Swallow feeders and can still be used. Key Words : Feeder/Over Current Relay/ protection system