ctrlnum 390
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://eprints.polsri.ac.id/390/</relation><title>STUDI PERHITUNGAN SETTING RELE ARUS LEBIH PADA PENYULANG WALET DI GARDU INDUK SEDUDUK PUTIH PALEMBANG</title><creator>KESUMA JAYA, HENDRO </creator><subject>TJ Mechanical engineering and machinery</subject><description>The distribution system in the common power disturbances that can hinder the process of distribution of electric power, therefore it needs the installation of a security that it can secure the disorder, can diketeahui on each feeder in the event of a short circuit, not only cause kontinyunitas disruption of the distribution of power to the load (consumer) but also cause damage to the existing installation. Protection equipment which is used for one feeder overcurrent relays is / Over Current Relay (OCR). To achieve a better state in the power distribution and substation equipment installed on the primary distribution network, it is also necessary to setup security overcurrent relays existing in order to obtain reliability, speed, sensitivity and selectivity. In this final report the calculation of 3-phase short-circuit current and the current settings on Swallow feeders supplied from power transformers (II) 30 MVA at PT. PLN (Persero) substation Seduduk Putih Palembang. After doing the calculations and compare with the security that has been installed in accordance turns Swallow feeders and can still be used.&#xD; Key Words : Feeder/Over Current Relay/ protection system</description><date>2014-07</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/390/1/COVER.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/390/2/BAB%20I.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/390/3/BAB%20II.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/390/4/BAB%20III.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/390/5/BAB%20IV.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/390/6/BAB%20V.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://eprints.polsri.ac.id/390/7/DAFTAR%20PUSTAKA.pdf</identifier><identifier> KESUMA JAYA, HENDRO (2014) STUDI PERHITUNGAN SETTING RELE ARUS LEBIH PADA PENYULANG WALET DI GARDU INDUK SEDUDUK PUTIH PALEMBANG. Other thesis, Politeknik Negeri Sriwijaya. </identifier><recordID>390</recordID></dc>
language eng
format Thesis:Thesis
Thesis
PeerReview:NonPeerReviewed
PeerReview
Book:Book
Book
author KESUMA JAYA, HENDRO
title STUDI PERHITUNGAN SETTING RELE ARUS LEBIH PADA PENYULANG WALET DI GARDU INDUK SEDUDUK PUTIH PALEMBANG
publishDate 2014
topic TJ Mechanical engineering and machinery
url http://eprints.polsri.ac.id/390/1/COVER.pdf
http://eprints.polsri.ac.id/390/2/BAB%20I.pdf
http://eprints.polsri.ac.id/390/3/BAB%20II.pdf
http://eprints.polsri.ac.id/390/4/BAB%20III.pdf
http://eprints.polsri.ac.id/390/5/BAB%20IV.pdf
http://eprints.polsri.ac.id/390/6/BAB%20V.pdf
http://eprints.polsri.ac.id/390/7/DAFTAR%20PUSTAKA.pdf
http://eprints.polsri.ac.id/390/
contents The distribution system in the common power disturbances that can hinder the process of distribution of electric power, therefore it needs the installation of a security that it can secure the disorder, can diketeahui on each feeder in the event of a short circuit, not only cause kontinyunitas disruption of the distribution of power to the load (consumer) but also cause damage to the existing installation. Protection equipment which is used for one feeder overcurrent relays is / Over Current Relay (OCR). To achieve a better state in the power distribution and substation equipment installed on the primary distribution network, it is also necessary to setup security overcurrent relays existing in order to obtain reliability, speed, sensitivity and selectivity. In this final report the calculation of 3-phase short-circuit current and the current settings on Swallow feeders supplied from power transformers (II) 30 MVA at PT. PLN (Persero) substation Seduduk Putih Palembang. After doing the calculations and compare with the security that has been installed in accordance turns Swallow feeders and can still be used. Key Words : Feeder/Over Current Relay/ protection system
id IOS15200.390
institution Politeknik Negeri Sriwijaya
institution_id 186
institution_type library:university
library
library Perpustakaan Politeknik Negeri Sriwijaya
library_id 333
collection Perpustakaan Politeknik Negeri Sriwijaya
repository_id 15200
city KOTA PALEMBANG
province SUMATERA SELATAN
repoId IOS15200
first_indexed 2021-08-25T09:27:46Z
last_indexed 2021-08-25T09:27:46Z
recordtype dc
_version_ 1709058411475238912
score 17.538404