ANALISA WAKTU PENJADWALAN PROYEK DENGAN METODE CPM (CRITICAL PATH METHOD) (Studi Kasus: Proyek Pembangunan Sarana/Prasarana Pengendali Sedimen Batang Air Dingin Kota Padang Sumatera Barat)
ctrlnum |
1957 |
---|---|
fullrecord |
<?xml version="1.0"?>
<dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://repo.bunghatta.ac.id/1957/</relation><title>ANALISA WAKTU PENJADWALAN PROYEK DENGAN METODE CPM
(CRITICAL PATH METHOD)
(Studi Kasus: Proyek Pembangunan Sarana/Prasarana Pengendali Sedimen
Batang Air Dingin Kota Padang Sumatera Barat)</title><creator>Edi, Pranoto</creator><creator>Rahmat, Rahmat</creator><creator>Yulcherlina, Yulcherlina</creator><subject>TA Engineering (General). Civil engineering (General)</subject><description>Penelitian yang telah dilakukan terhadap proyek pembangunan Pembangunan Bangunan
Prasarana Pengendali Sedimen Batang Air Dingin menggunakan metode CPM. CPM
membuat asumsi bahwa waktu kegiatan diketahui pasti, hingga hanya diperlukan satu
faktor waktu untuk tiap kegiatan. Faktor-faktor yang mempengaruhi durasi pengerjaan
proyek pembangunan Pembangunan Bangunan Prasarana Pengendali Sedimen Batang
Air Dingin adalah Kuantitas, Peralatan, Material, Waktu, Biaya, Metode, Pelaksanaan,
Sumber Tenaga Kerja (SDM) Dengan menggunakan metode CPM proyek
pembangunan bendungan di Air Dingin Kota Padang dapat selesai dalam jangka waktu
445 hari, dan lintasan kritis terletak pada kegiatan A – B2 – B6 – C2 – C7 .
Kata Kunci : Critical Path Method (CPM), Penjadwalan, Pembangunan Bendungan.</description><date>2020-12</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><type>Book:Book</type><language>eng</language><identifier>http://repo.bunghatta.ac.id/1957/1/38%20Edi%20Pranoto%201310015211043%20Cover.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://repo.bunghatta.ac.id/1957/2/38%20Edi%20Pranoto%201310015211043%20Abstrak.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://repo.bunghatta.ac.id/1957/3/38%20Edi%20Pranoto%201310015211043%20BAB%20I.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://repo.bunghatta.ac.id/1957/4/38%20Edi%20Pranoto%201310015211043%20BAB%20II.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://repo.bunghatta.ac.id/1957/5/38%20Edi%20Pranoto%201310015211043%20BAB%20III.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://repo.bunghatta.ac.id/1957/6/38%20Edi%20Pranoto%201310015211043%20BAB%20IV.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://repo.bunghatta.ac.id/1957/7/38%20Edi%20Pranoto%201310015211043%20BAB%20V.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://repo.bunghatta.ac.id/1957/8/38%20Edi%20Pranoto%201310015211043%20Daftar%20Pustaka.pdf</identifier><identifier> Edi, Pranoto and Rahmat, Rahmat and Yulcherlina, Yulcherlina (2020) ANALISA WAKTU PENJADWALAN PROYEK DENGAN METODE CPM (CRITICAL PATH METHOD) (Studi Kasus: Proyek Pembangunan Sarana/Prasarana Pengendali Sedimen Batang Air Dingin Kota Padang Sumatera Barat). Diploma thesis, UNIVERSITAS BUNG HATTA. </identifier><recordID>1957</recordID></dc>
|
language |
eng |
format |
Thesis:Thesis Thesis PeerReview:NonPeerReviewed PeerReview Book:Book Book |
author |
Edi, Pranoto Rahmat, Rahmat Yulcherlina, Yulcherlina |
title |
ANALISA WAKTU PENJADWALAN PROYEK DENGAN METODE CPM
(CRITICAL PATH METHOD)
(Studi Kasus: Proyek Pembangunan Sarana/Prasarana Pengendali Sedimen
Batang Air Dingin Kota Padang Sumatera Barat) |
publishDate |
2020 |
isbn |
2013100152110 |
topic |
TA Engineering (General). Civil engineering (General) |
url |
http://repo.bunghatta.ac.id/1957/1/38%20Edi%20Pranoto%201310015211043%20Cover.pdf http://repo.bunghatta.ac.id/1957/2/38%20Edi%20Pranoto%201310015211043%20Abstrak.pdf http://repo.bunghatta.ac.id/1957/3/38%20Edi%20Pranoto%201310015211043%20BAB%20I.pdf http://repo.bunghatta.ac.id/1957/4/38%20Edi%20Pranoto%201310015211043%20BAB%20II.pdf http://repo.bunghatta.ac.id/1957/5/38%20Edi%20Pranoto%201310015211043%20BAB%20III.pdf http://repo.bunghatta.ac.id/1957/6/38%20Edi%20Pranoto%201310015211043%20BAB%20IV.pdf http://repo.bunghatta.ac.id/1957/7/38%20Edi%20Pranoto%201310015211043%20BAB%20V.pdf http://repo.bunghatta.ac.id/1957/8/38%20Edi%20Pranoto%201310015211043%20Daftar%20Pustaka.pdf http://repo.bunghatta.ac.id/1957/ |
contents |
Penelitian yang telah dilakukan terhadap proyek pembangunan Pembangunan Bangunan
Prasarana Pengendali Sedimen Batang Air Dingin menggunakan metode CPM. CPM
membuat asumsi bahwa waktu kegiatan diketahui pasti, hingga hanya diperlukan satu
faktor waktu untuk tiap kegiatan. Faktor-faktor yang mempengaruhi durasi pengerjaan
proyek pembangunan Pembangunan Bangunan Prasarana Pengendali Sedimen Batang
Air Dingin adalah Kuantitas, Peralatan, Material, Waktu, Biaya, Metode, Pelaksanaan,
Sumber Tenaga Kerja (SDM) Dengan menggunakan metode CPM proyek
pembangunan bendungan di Air Dingin Kota Padang dapat selesai dalam jangka waktu
445 hari, dan lintasan kritis terletak pada kegiatan A – B2 – B6 – C2 – C7 .
Kata Kunci : Critical Path Method (CPM), Penjadwalan, Pembangunan Bendungan. |
id |
IOS14200.1957 |
institution |
universitas bung hatta |
affiliation |
onesearch.perpusnas.go.id |
institution_id |
2476 |
institution_type |
library:university library |
library |
Perpustakaan Universitas Bung Hatta |
library_id |
3754 |
collection |
Repository Universitas Bung Hatta |
repository_id |
14200 |
city |
KOTA PADANG |
province |
SUMATERA BARAT |
repoId |
IOS14200 |
first_indexed |
2020-12-23T12:21:59Z |
last_indexed |
2020-12-23T12:21:59Z |
recordtype |
dc |
_version_ |
1686871799323688960 |
score |
17.538404 |