Edi, P. (2020). ANALISA WAKTU PENJADWALAN PROYEK DENGAN METODE CPM (CRITICAL PATH METHOD) (Studi Kasus: Proyek Pembangunan Sarana/Prasarana Pengendali Sedimen Batang Air Dingin Kota Padang Sumatera Barat).
Chicago Style CitationEdi, Pranoto. ANALISA WAKTU PENJADWALAN PROYEK DENGAN METODE CPM (CRITICAL PATH METHOD) (Studi Kasus: Proyek Pembangunan Sarana/Prasarana Pengendali Sedimen Batang Air Dingin Kota Padang Sumatera Barat). 2020.
MLA CitationEdi, Pranoto. ANALISA WAKTU PENJADWALAN PROYEK DENGAN METODE CPM (CRITICAL PATH METHOD) (Studi Kasus: Proyek Pembangunan Sarana/Prasarana Pengendali Sedimen Batang Air Dingin Kota Padang Sumatera Barat). 2020.
Warning: These citations may not always be 100% accurate.