APA Citation

Edi, P. (2020). ANALISA WAKTU PENJADWALAN PROYEK DENGAN METODE CPM (CRITICAL PATH METHOD) (Studi Kasus: Proyek Pembangunan Sarana/Prasarana Pengendali Sedimen Batang Air Dingin Kota Padang Sumatera Barat).

Chicago Style Citation

Edi, Pranoto. ANALISA WAKTU PENJADWALAN PROYEK DENGAN METODE CPM (CRITICAL PATH METHOD) (Studi Kasus: Proyek Pembangunan Sarana/Prasarana Pengendali Sedimen Batang Air Dingin Kota Padang Sumatera Barat). 2020.

MLA Citation

Edi, Pranoto. ANALISA WAKTU PENJADWALAN PROYEK DENGAN METODE CPM (CRITICAL PATH METHOD) (Studi Kasus: Proyek Pembangunan Sarana/Prasarana Pengendali Sedimen Batang Air Dingin Kota Padang Sumatera Barat). 2020.

Warning: These citations may not always be 100% accurate.