Skip to content
Toggle navigation
Tentang IOS
Join Us
Hubungi Kami
Organisasi Mitra
Akun Anda
Keluar
Masuk
Bahasa Indonesia
Bahasa Indonesia
English
Semua Kolom
Judul
Pengarang
Subject
Call Number
ISBN/ISSN
Tag
Cari
Lanjutan
PENJADWALAN PRODUKSI JOB SHOP...
Preview
Koleksi Nasional
Sitasi Cantuman
Kirim via Email
Ekspor Cantuman
Export to RefWorks
Export to EndNoteWeb
Export to EndNote
Favorit
PENJADWALAN PRODUKSI JOB SHOP MENGGUNAKAN ALGORITMA NON DELAY UNTUK MEMINIMUMKAN MEAN FLOW TIME DI CV. SIMAS FIBER GLASS
Tersimpan di:
Main Authors:
M., Hibron
,
Dessi, Mufti
,
Ayu, Bidiawati Jr
Format:
Thesis
NonPeerReviewed
Book
Bahasa:
eng
Terbitan:
,
2020
Subjects:
T Technology (General)
TX Home economics
Online Access:
http://repo.bunghatta.ac.id/1748/1/24.%20M.%20Hibron%201410017311042%20Cover.pdf
http://repo.bunghatta.ac.id/1748/3/24.%20M.%20Hibron%201410017311042%20Abstrak.pdf
http://repo.bunghatta.ac.id/1748/2/24.%20M.%20Hibron%201410017311042%20BAB%20I.pdf
http://repo.bunghatta.ac.id/1748/4/24.%20M.%20Hibron%201410017311042%20BAB%20II.pdf
http://repo.bunghatta.ac.id/1748/6/24.%20M.%20Hibron%201410017311042%20BAB%20III.pdf
http://repo.bunghatta.ac.id/1748/7/24.%20M.%20Hibron%201410017311042%20BAB%20IV.pdf
http://repo.bunghatta.ac.id/1748/8/24.%20M.%20Hibron%201410017311042%20BAB%20V.pdf
http://repo.bunghatta.ac.id/1748/9/24.%20M.%20Hibron%201410017311042%20BAB%20VI.pdf
http://repo.bunghatta.ac.id/1748/10/24.%20M.%20Hibron%201410017311042%20Daftar%20Pustaka.pdf
http://repo.bunghatta.ac.id/1748/
Lokasi
Deskripsi
Daftar Isi
Preview
Tampilan Petugas
Lihat Juga
PERENCANAAN PERSEDIAAN BAHAN BAKU UTAMA BERDASARKAN PENJADWALAN PRODUK DI CV. BUNDA PERABOT
oleh: Gemina, Oktaria, et al.
Terbitan: (2020)
Penjadwalan Job Shop Mesin Majemuk Menggunakan Algoritma Non Delay Untuk Meminimumkan Mean Flow Time Dan Penentuan Due Date
oleh: Cahyanto, Wisnu Nur, et al.
Terbitan: (2016)
PENENTUAN JUMLAH TENAGA KERJA DAN MESIN PADA PROSES PRODUKSI DI CV. SIMAS FIBER GLASS BERDASARKAN WAKTU STANDAR
oleh: Ridho, Aulia Jafri, et al.
Terbitan: (2020)
KAJIAN PENJADWALAN FLOWSHOP IMPROVE ALGORITMA HODGSON UNTUK MEMINIMASI NUMBER OF TARDY JOB DI CV. AM TEKNIK
oleh: Maulana, Pujiyanto, et al.
Terbitan: (2020)
PERENCANAAN PRODUKSI LADU ARAI PINANG DENGAN MENGGUNAKAN METODE GOAL PROGRAMMING
oleh: Diny, Novia, et al.
Terbitan: (2020)
×
Loading...