PENJADWALAN PRODUKSI JOB SHOP MENGGUNAKAN ALGORITMA NON DELAY UNTUK MEMINIMUMKAN MEAN FLOW TIME DI CV. SIMAS FIBER GLASS
ctrlnum |
1748 |
---|---|
fullrecord |
<?xml version="1.0"?>
<dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://repo.bunghatta.ac.id/1748/</relation><title>PENJADWALAN PRODUKSI JOB SHOP MENGGUNAKAN ALGORITMA NON DELAY UNTUK MEMINIMUMKAN MEAN FLOW TIME DI CV. SIMAS FIBER GLASS</title><creator>M., Hibron</creator><creator>Dessi, Mufti</creator><creator>Ayu, Bidiawati Jr</creator><subject>T Technology (General)</subject><subject>TX Home economics</subject><description>CV. Simas Fiber Glass merupakan salah satu perusahaan pembuat wahana play ground
dan terlibat dalam pembuatan kontruksi, perusahaan ini berlokasi dijalan By pass Km 9,5, Kel.
Korong Gadang, Kec. Kuranji, Kota Padang. Dalam memproduksi produksnya CV. Simas Fiber
Glass hanya melayani pesanan saja (Job Shop) dan melibatkan banyak mesin dalam proses
pengerjaannya. Dalam memenuhi kebutuhan pelanggan tersebut masih adanya mesin yang
menganggur ketika mengerjakan job lain, sehingga sering terjadi keterlambatan penyelesaian
waktu pengerjaan job atau melebihi batas (due date). Adapun metode yang memiliki fungsi untuk
meminimasi jumlah dan waktu keterlambatan adalah menggunakan metode non delay.
Penjadwalan non delay merupakan jadwal nyata yang tidak membiarkan satupun mesin dalam
keadaan menganggur, sehingga dapat menghasilkan jumlah dan waktu keterlambatan minimum.
Hasil dari penjadwalan menggunakan non delay menunjukkan total waktu penyelesaian sebesar
484 menit. Dengan urutan proses 111-413-121-426-513-137-211-435-526-221-143-237-311-245-
447-321-154-257-537-165-337-542-176-345-353-187-364-376-387. Dengan total hanya satu job
yang mengalami keterlambatan dibandingkan penjadwalan yang dilakukan oleh perusahaan yaitu
sebesar 624 menit dengan total 3 job yang terlambat yaitu pada job 3, job 4 dan job 5. Waktu yang
mengalami keterlambatan pada non delay relatif lebih kecil dibanding dengan keterlambatan yang
dilakukan oleh perusahaan. penjadwalan dengan metode non delay memungkinkan beberapa
operasi dilakukan dalam waktu yang bersamaan tetapi dengan mesin yang berbeda sehingga bila
diterapkan oleh perusahaan dapat meningkatkan produktifitas produksinya.
Kata Kunci : Due Date, Job, Kterlambatan, Non Delay, Penjadwalan</description><date>2020-11</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><type>Book:Book</type><language>eng</language><identifier>http://repo.bunghatta.ac.id/1748/1/24.%20M.%20Hibron%201410017311042%20Cover.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://repo.bunghatta.ac.id/1748/3/24.%20M.%20Hibron%201410017311042%20Abstrak.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://repo.bunghatta.ac.id/1748/2/24.%20M.%20Hibron%201410017311042%20BAB%20I.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://repo.bunghatta.ac.id/1748/4/24.%20M.%20Hibron%201410017311042%20BAB%20II.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://repo.bunghatta.ac.id/1748/6/24.%20M.%20Hibron%201410017311042%20BAB%20III.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://repo.bunghatta.ac.id/1748/7/24.%20M.%20Hibron%201410017311042%20BAB%20IV.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://repo.bunghatta.ac.id/1748/8/24.%20M.%20Hibron%201410017311042%20BAB%20V.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://repo.bunghatta.ac.id/1748/9/24.%20M.%20Hibron%201410017311042%20BAB%20VI.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://repo.bunghatta.ac.id/1748/10/24.%20M.%20Hibron%201410017311042%20Daftar%20Pustaka.pdf</identifier><identifier> M., Hibron and Dessi, Mufti and Ayu, Bidiawati Jr (2020) PENJADWALAN PRODUKSI JOB SHOP MENGGUNAKAN ALGORITMA NON DELAY UNTUK MEMINIMUMKAN MEAN FLOW TIME DI CV. SIMAS FIBER GLASS. Diploma thesis, Universitas Bung Hatta. </identifier><recordID>1748</recordID></dc>
|
language |
eng |
format |
Thesis:Thesis Thesis PeerReview:NonPeerReviewed PeerReview Book:Book Book |
author |
M., Hibron Dessi, Mufti Ayu, Bidiawati Jr |
title |
PENJADWALAN PRODUKSI JOB SHOP MENGGUNAKAN ALGORITMA NON DELAY UNTUK MEMINIMUMKAN MEAN FLOW TIME DI CV. SIMAS FIBER GLASS |
publishDate |
2020 |
isbn |
2014100173110 |
topic |
T Technology (General) TX Home economics |
url |
http://repo.bunghatta.ac.id/1748/1/24.%20M.%20Hibron%201410017311042%20Cover.pdf http://repo.bunghatta.ac.id/1748/3/24.%20M.%20Hibron%201410017311042%20Abstrak.pdf http://repo.bunghatta.ac.id/1748/2/24.%20M.%20Hibron%201410017311042%20BAB%20I.pdf http://repo.bunghatta.ac.id/1748/4/24.%20M.%20Hibron%201410017311042%20BAB%20II.pdf http://repo.bunghatta.ac.id/1748/6/24.%20M.%20Hibron%201410017311042%20BAB%20III.pdf http://repo.bunghatta.ac.id/1748/7/24.%20M.%20Hibron%201410017311042%20BAB%20IV.pdf http://repo.bunghatta.ac.id/1748/8/24.%20M.%20Hibron%201410017311042%20BAB%20V.pdf http://repo.bunghatta.ac.id/1748/9/24.%20M.%20Hibron%201410017311042%20BAB%20VI.pdf http://repo.bunghatta.ac.id/1748/10/24.%20M.%20Hibron%201410017311042%20Daftar%20Pustaka.pdf http://repo.bunghatta.ac.id/1748/ |
contents |
CV. Simas Fiber Glass merupakan salah satu perusahaan pembuat wahana play ground
dan terlibat dalam pembuatan kontruksi, perusahaan ini berlokasi dijalan By pass Km 9,5, Kel.
Korong Gadang, Kec. Kuranji, Kota Padang. Dalam memproduksi produksnya CV. Simas Fiber
Glass hanya melayani pesanan saja (Job Shop) dan melibatkan banyak mesin dalam proses
pengerjaannya. Dalam memenuhi kebutuhan pelanggan tersebut masih adanya mesin yang
menganggur ketika mengerjakan job lain, sehingga sering terjadi keterlambatan penyelesaian
waktu pengerjaan job atau melebihi batas (due date). Adapun metode yang memiliki fungsi untuk
meminimasi jumlah dan waktu keterlambatan adalah menggunakan metode non delay.
Penjadwalan non delay merupakan jadwal nyata yang tidak membiarkan satupun mesin dalam
keadaan menganggur, sehingga dapat menghasilkan jumlah dan waktu keterlambatan minimum.
Hasil dari penjadwalan menggunakan non delay menunjukkan total waktu penyelesaian sebesar
484 menit. Dengan urutan proses 111-413-121-426-513-137-211-435-526-221-143-237-311-245-
447-321-154-257-537-165-337-542-176-345-353-187-364-376-387. Dengan total hanya satu job
yang mengalami keterlambatan dibandingkan penjadwalan yang dilakukan oleh perusahaan yaitu
sebesar 624 menit dengan total 3 job yang terlambat yaitu pada job 3, job 4 dan job 5. Waktu yang
mengalami keterlambatan pada non delay relatif lebih kecil dibanding dengan keterlambatan yang
dilakukan oleh perusahaan. penjadwalan dengan metode non delay memungkinkan beberapa
operasi dilakukan dalam waktu yang bersamaan tetapi dengan mesin yang berbeda sehingga bila
diterapkan oleh perusahaan dapat meningkatkan produktifitas produksinya.
Kata Kunci : Due Date, Job, Kterlambatan, Non Delay, Penjadwalan |
id |
IOS14200.1748 |
institution |
universitas bung hatta |
affiliation |
onesearch.perpusnas.go.id |
institution_id |
2476 |
institution_type |
library:university library |
library |
Perpustakaan Universitas Bung Hatta |
library_id |
3754 |
collection |
Repository Universitas Bung Hatta |
repository_id |
14200 |
city |
KOTA PADANG |
province |
SUMATERA BARAT |
repoId |
IOS14200 |
first_indexed |
2020-11-28T13:48:04Z |
last_indexed |
2020-11-28T13:48:04Z |
recordtype |
dc |
_version_ |
1686871797858828288 |
score |
17.538404 |