fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://repo.bunghatta.ac.id/1748/</relation><title>PENJADWALAN PRODUKSI JOB SHOP MENGGUNAKAN ALGORITMA NON DELAY UNTUK MEMINIMUMKAN MEAN FLOW TIME DI CV. SIMAS FIBER GLASS</title><creator>M., Hibron</creator><creator>Dessi, Mufti</creator><creator>Ayu, Bidiawati Jr</creator><subject>T Technology (General)</subject><subject>TX Home economics</subject><description>CV. Simas Fiber Glass merupakan salah satu perusahaan pembuat wahana play ground&#xD; dan terlibat dalam pembuatan kontruksi, perusahaan ini berlokasi dijalan By pass Km 9,5, Kel.&#xD; Korong Gadang, Kec. Kuranji, Kota Padang. Dalam memproduksi produksnya CV. Simas Fiber&#xD; Glass hanya melayani pesanan saja (Job Shop) dan melibatkan banyak mesin dalam proses&#xD; pengerjaannya. Dalam memenuhi kebutuhan pelanggan tersebut masih adanya mesin yang&#xD; menganggur ketika mengerjakan job lain, sehingga sering terjadi keterlambatan penyelesaian&#xD; waktu pengerjaan job atau melebihi batas (due date). Adapun metode yang memiliki fungsi untuk&#xD; meminimasi jumlah dan waktu keterlambatan adalah menggunakan metode non delay.&#xD; Penjadwalan non delay merupakan jadwal nyata yang tidak membiarkan satupun mesin dalam&#xD; keadaan menganggur, sehingga dapat menghasilkan jumlah dan waktu keterlambatan minimum.&#xD; Hasil dari penjadwalan menggunakan non delay menunjukkan total waktu penyelesaian sebesar&#xD; 484 menit. Dengan urutan proses 111-413-121-426-513-137-211-435-526-221-143-237-311-245-&#xD; 447-321-154-257-537-165-337-542-176-345-353-187-364-376-387. Dengan total hanya satu job&#xD; yang mengalami keterlambatan dibandingkan penjadwalan yang dilakukan oleh perusahaan yaitu&#xD; sebesar 624 menit dengan total 3 job yang terlambat yaitu pada job 3, job 4 dan job 5. Waktu yang&#xD; mengalami keterlambatan pada non delay relatif lebih kecil dibanding dengan keterlambatan yang&#xD; dilakukan oleh perusahaan. penjadwalan dengan metode non delay memungkinkan beberapa&#xD; operasi dilakukan dalam waktu yang bersamaan tetapi dengan mesin yang berbeda sehingga bila&#xD; diterapkan oleh perusahaan dapat meningkatkan produktifitas produksinya.&#xD; Kata Kunci : Due Date, Job, Kterlambatan, Non Delay, Penjadwalan</description><date>2020-11</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><type>Book:Book</type><language>eng</language><identifier>http://repo.bunghatta.ac.id/1748/1/24.%20M.%20Hibron%201410017311042%20Cover.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://repo.bunghatta.ac.id/1748/3/24.%20M.%20Hibron%201410017311042%20Abstrak.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://repo.bunghatta.ac.id/1748/2/24.%20M.%20Hibron%201410017311042%20BAB%20I.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://repo.bunghatta.ac.id/1748/4/24.%20M.%20Hibron%201410017311042%20BAB%20II.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://repo.bunghatta.ac.id/1748/6/24.%20M.%20Hibron%201410017311042%20BAB%20III.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://repo.bunghatta.ac.id/1748/7/24.%20M.%20Hibron%201410017311042%20BAB%20IV.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://repo.bunghatta.ac.id/1748/8/24.%20M.%20Hibron%201410017311042%20BAB%20V.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://repo.bunghatta.ac.id/1748/9/24.%20M.%20Hibron%201410017311042%20BAB%20VI.pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://repo.bunghatta.ac.id/1748/10/24.%20M.%20Hibron%201410017311042%20Daftar%20Pustaka.pdf</identifier><identifier> M., Hibron and Dessi, Mufti and Ayu, Bidiawati Jr (2020) PENJADWALAN PRODUKSI JOB SHOP MENGGUNAKAN ALGORITMA NON DELAY UNTUK MEMINIMUMKAN MEAN FLOW TIME DI CV. SIMAS FIBER GLASS. Diploma thesis, Universitas Bung Hatta. </identifier><recordID>1748</recordID></dc>
language eng
format Thesis:Thesis
Thesis
PeerReview:NonPeerReviewed
PeerReview
Book:Book
Book
author M., Hibron
Dessi, Mufti
Ayu, Bidiawati Jr
title PENJADWALAN PRODUKSI JOB SHOP MENGGUNAKAN ALGORITMA NON DELAY UNTUK MEMINIMUMKAN MEAN FLOW TIME DI CV. SIMAS FIBER GLASS
publishDate 2020
isbn 2014100173110
topic T Technology (General)
TX Home economics
url http://repo.bunghatta.ac.id/1748/1/24.%20M.%20Hibron%201410017311042%20Cover.pdf
http://repo.bunghatta.ac.id/1748/3/24.%20M.%20Hibron%201410017311042%20Abstrak.pdf
http://repo.bunghatta.ac.id/1748/2/24.%20M.%20Hibron%201410017311042%20BAB%20I.pdf
http://repo.bunghatta.ac.id/1748/4/24.%20M.%20Hibron%201410017311042%20BAB%20II.pdf
http://repo.bunghatta.ac.id/1748/6/24.%20M.%20Hibron%201410017311042%20BAB%20III.pdf
http://repo.bunghatta.ac.id/1748/7/24.%20M.%20Hibron%201410017311042%20BAB%20IV.pdf
http://repo.bunghatta.ac.id/1748/8/24.%20M.%20Hibron%201410017311042%20BAB%20V.pdf
http://repo.bunghatta.ac.id/1748/9/24.%20M.%20Hibron%201410017311042%20BAB%20VI.pdf
http://repo.bunghatta.ac.id/1748/10/24.%20M.%20Hibron%201410017311042%20Daftar%20Pustaka.pdf
http://repo.bunghatta.ac.id/1748/
contents CV. Simas Fiber Glass merupakan salah satu perusahaan pembuat wahana play ground dan terlibat dalam pembuatan kontruksi, perusahaan ini berlokasi dijalan By pass Km 9,5, Kel. Korong Gadang, Kec. Kuranji, Kota Padang. Dalam memproduksi produksnya CV. Simas Fiber Glass hanya melayani pesanan saja (Job Shop) dan melibatkan banyak mesin dalam proses pengerjaannya. Dalam memenuhi kebutuhan pelanggan tersebut masih adanya mesin yang menganggur ketika mengerjakan job lain, sehingga sering terjadi keterlambatan penyelesaian waktu pengerjaan job atau melebihi batas (due date). Adapun metode yang memiliki fungsi untuk meminimasi jumlah dan waktu keterlambatan adalah menggunakan metode non delay. Penjadwalan non delay merupakan jadwal nyata yang tidak membiarkan satupun mesin dalam keadaan menganggur, sehingga dapat menghasilkan jumlah dan waktu keterlambatan minimum. Hasil dari penjadwalan menggunakan non delay menunjukkan total waktu penyelesaian sebesar 484 menit. Dengan urutan proses 111-413-121-426-513-137-211-435-526-221-143-237-311-245- 447-321-154-257-537-165-337-542-176-345-353-187-364-376-387. Dengan total hanya satu job yang mengalami keterlambatan dibandingkan penjadwalan yang dilakukan oleh perusahaan yaitu sebesar 624 menit dengan total 3 job yang terlambat yaitu pada job 3, job 4 dan job 5. Waktu yang mengalami keterlambatan pada non delay relatif lebih kecil dibanding dengan keterlambatan yang dilakukan oleh perusahaan. penjadwalan dengan metode non delay memungkinkan beberapa operasi dilakukan dalam waktu yang bersamaan tetapi dengan mesin yang berbeda sehingga bila diterapkan oleh perusahaan dapat meningkatkan produktifitas produksinya. Kata Kunci : Due Date, Job, Kterlambatan, Non Delay, Penjadwalan
id IOS14200.1748
institution universitas bung hatta
affiliation onesearch.perpusnas.go.id
institution_id 2476
institution_type library:university
library
library Perpustakaan Universitas Bung Hatta
library_id 3754
collection Repository Universitas Bung Hatta
repository_id 14200
city KOTA PADANG
province SUMATERA BARAT
repoId IOS14200
first_indexed 2020-11-28T13:48:04Z
last_indexed 2020-11-28T13:48:04Z
recordtype dc
_version_ 1686871797858828288
score 17.538404