Skip to content
  • Tentang IOS
  • Join Us
  • Hubungi Kami
  • Organisasi Mitra
  • Akun Anda
  • Keluar
  • Masuk
  • Bahasa Indonesia
    • Bahasa Indonesia
    • English
Lanjutan
  • Cari
  • ANALISA PERHITUNGAN BIAYA PEKE...
  • Lokasi
  • Koleksi Nasional
  • Sitasi Cantuman
  • Kirim via Email
  • Ekspor Cantuman
    • Export to RefWorks
    • Export to EndNoteWeb
    • Export to EndNote
  • Favorit
Cover Image

ANALISA PERHITUNGAN BIAYA PEKERJAAN MEKANIKAL ELEKTRIKAL DAN PLUMBING PROYEK CONTROL BUILDING SCBD

Tersimpan di:
Main Authors: Fariz, Muhammad Akbar, Wahyudi, P. Utama, Zulherman, Zulherman
Format: Thesis NonPeerReviewed Book
Bahasa: eng
Terbitan: , 2020
Subjects:
TH Building construction
Online Access: http://repo.bunghatta.ac.id/1619/6/38.%20FARIZ%20MUHAMMAD%20A.%20%201710015410114%20COVER.pdf
http://repo.bunghatta.ac.id/1619/1/38.%20FARIZ%20MUHAMMAD%20A.%20%201710015410114%20ABSTRAK.pdf
http://repo.bunghatta.ac.id/1619/2/38.%20FARIZ%20MUHAMMAD%20A.%20%201710015410114%20BAB%20I.pdf
http://repo.bunghatta.ac.id/1619/3/38.%20FARIZ%20MUHAMMAD%20A.%20%201710015410114%20BAB%20II.pdf
http://repo.bunghatta.ac.id/1619/4/38.%20FARIZ%20MUHAMMAD%20A.%20%201710015410114%20BAB%20III.pdf
http://repo.bunghatta.ac.id/1619/5/38.%20FARIZ%20MUHAMMAD%20A.%20%201710015410114%20BAB%20IV.pdf
http://repo.bunghatta.ac.id/1619/7/38.%20FARIZ%20MUHAMMAD%20A.%20%201710015410114%20DAFTAR%20PUSTAKA.pdf
http://repo.bunghatta.ac.id/1619/
  • Lokasi
  • Deskripsi
  • Daftar Isi
  • Preview
  • Tampilan Petugas

Internet

http://repo.bunghatta.ac.id/1619/6/38.%20FARIZ%20MUHAMMAD%20A.%20%201710015410114%20COVER.pdf
http://repo.bunghatta.ac.id/1619/1/38.%20FARIZ%20MUHAMMAD%20A.%20%201710015410114%20ABSTRAK.pdf
http://repo.bunghatta.ac.id/1619/2/38.%20FARIZ%20MUHAMMAD%20A.%20%201710015410114%20BAB%20I.pdf
http://repo.bunghatta.ac.id/1619/3/38.%20FARIZ%20MUHAMMAD%20A.%20%201710015410114%20BAB%20II.pdf
http://repo.bunghatta.ac.id/1619/4/38.%20FARIZ%20MUHAMMAD%20A.%20%201710015410114%20BAB%20III.pdf
http://repo.bunghatta.ac.id/1619/5/38.%20FARIZ%20MUHAMMAD%20A.%20%201710015410114%20BAB%20IV.pdf
http://repo.bunghatta.ac.id/1619/7/38.%20FARIZ%20MUHAMMAD%20A.%20%201710015410114%20DAFTAR%20PUSTAKA.pdf
http://repo.bunghatta.ac.id/1619/

Lokasi

Koleksi Repository Universitas Bung Hatta
Gedung Perpustakaan Universitas Bung Hatta
Institusi universitas bung hatta
Kota KOTA PADANG
Provinsi SUMATERA BARAT
Kontak Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini.

Lihat Juga

  • ANALISA PERHITUNGAN BIAYA PEKERJAAN MEKANIKAL ELEKTRIKAL DAN PLUMBING PADA PROYEK PEMBANGUNAN INFRASTRUKTUR ASSESSMENT CENTER SDM SIBER DAN SANDI
    oleh: Muhammad, Ichsan, et al.
    Terbitan: (2020)
  • ANALISA PERHITUNGAN BIAYA PEKERJAAN MEKANIKAL, ELEKTRIKAL DAN PLUMBING PADA PROYEK EKA HOSPITAL BEKASI
    oleh: Ihsan, Rohmatullah, et al.
    Terbitan: (2020)
  • ANALISA PERHITUNGAN BIAYA PEKERJAAN ARSITEKTUR PADA PROYEK CONTROL BUILDING SCBD
    oleh: Afifah, Aulia Hesri, et al.
    Terbitan: (2020)
  • ANALISA PERHITUNGAN BIAYA PEKERJAAN MEKANIKAL ELEKTRIKAL DAN PLUMBING PROYEK MALL EAST COAST CENTER 2
    oleh: Dimas, Setya Permana, et al.
    Terbitan: (2020)
  • ANALISA PERHITUNGAN BIAYA PEKERJAAN STUKTUR ATAS PADA PROYEK JHL GALLERY
    oleh: Aldi, Basyir, et al.
    Terbitan: (2020)

Opsi Pencarian

  • Sejarah Pencarian
  • Pencarian Lanjut

Temukan Lebih Banyak

  • Penelusuran Katalog
  • Penelusuran Alfabetis

Butuh Bantuan?

  • Tips Pencarian
  • Admin
  • Hubungi Kami
© 2025 Perpustakaan Nasional Republik Indonesia
Loading...