ANALISIS EKSERGI PADA SISTEM PEMBANGKIT LISTRIK TENAGA PANAS BUMI (PLTP) UBP KAMOJANG UNIT PLTP 1 DARAJAT JAWA BARAT

Main Authors: Santoso, Dyos, Yusuf, Maulana
Format: Article NonPeerReviewed Book
Bahasa: eng
Terbitan: Fakultas Teknik UNSRI
Subjects:
Online Access: http://repository.unsri.ac.id/7352/1/Energy_exergy-PLTP_Prosiding_AVoER_4th_2012.pdf
http://repository.unsri.ac.id/7352/
Daftar Isi:
  • This paper presents the performance analysis of geothermal power plant which consist of some main components such as final separator, steam turbine, condensor, cooling tower and others. Observed geothermal power plant is the one that is dominated by working fluid, which vapour-dominated system. Based on the result of the performance analysis using exergy analysis method, the irreversibility at final separator, steam turbin, condensor and cooling tower consecutively is 12.80 MW, 24.65 MW, 3.084 MW and 3.823 MW.