Daftar Isi:
  • PT.Prima Abadi Karya (PT. PAK) one of the contractor that trusted by PT.Total Prima Indonesia (PT.TPI) to operate the project of nickel mining nikel at Bungku Pesisir district. PT.PAK is having stockyard for the width of 54.000,000 m2 or approximately 5,4 ha. To increase and support ore nickel mining production for the next years, we cannot deny that development and settlement of the dome are needed in the area of stockyard PT. PAK. This year PT. PAK targeted around 22.500 ton each months to produce the nickeland 27.000 ton a year, with all of the capacity only saprolite. Method that I am using for this research which are collecting all of the total tonnage of the dome and creating a development plan to increase the production of the nickel in PT.PAK. The purpose of this research is to indicate the reason and indicator that could influence the production in the stockyard in PT.PAK and analysis the total volume of the stockyard in PT.PAK. Currently, storage of stockyard PT. PAK can only carried around 15.000 ton ore nickel. Thats why development of stockyard is really needed from the current total tonnage is 54.000 m2 which will be added 2.000 m2 so the maximum totalof the stockyard is 74.000m2.