fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://repository.unsri.ac.id/1415/</relation><title>ANALISIS KETIDAKTERCAPAIAN DAN UPAYA MEMENUHI VOLUME PELEDAKAN TANAH PENUTUP DI PIT 2 DAN PIT 3 TAMBANG BATUBARA BANKO PT BUKIT ASAM TBK</title><creator>PRANATA, RENO</creator><creator>Toha, Taufik</creator><creator>Bochori, Bochori</creator><subject>TN1-997 Mining engineering. Metallurgy</subject><description>Blasting at PT Bukit Asam Tbk follows the monthly blasting plan which has a blasting volume target. Several times the blasting volume target planning with the realization in the field did not match the desired results. The purpose of this research is to find out the unreachable factors and efforts that must be made to meet the target of blasting volume from the factors that cause unattainable blasting volumes. The study was conducted in the West Banko mining area. Realization for 2018 starting from November was 1,895,647 BCM for Pit 2 and 3,518,702 BCM for Pit 3. The target for blasting volume for each year in 2018 was 900,000 BCM with a realization of 492,213 BCM or 54.69% of the total. The percentage that can be said to be boulder or&gt; 100 cm for Pit 3 is 7.24% and for Pit 2 is 3.45%, meaning that it still satisfies the fragmentation criteria that is good for both Pits using desktop 2.0 split software. The digging tool cycle time with an average time of 56.86 seconds and productivity of the digging tool was 911,057.68 BCM / month for Pit 2 and 89.93 seconds and productivity was 767,789.23 BCM / month. Factors affecting blasting volume targets are tool work efficiency, blasting geometry, rain and road conditions and lack of supervision. After the unreachable factors can be minimized by increasing work efficiency and supervision and rescheduling workdays if necessary so that the blasting volume target is 381,024 BCM / month for Pit 2 and 612,864 BCM / month for Pit 3 or can be achieved.</description><date>2019-06-27</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><type>Book:Book</type><language>ind</language><rights>cc_public_domain</rights><identifier>http://repository.unsri.ac.id/1415/6/RAMA_31201_03021181520007%5B1%5D.pdf</identifier><type>Book:Book</type><language>ind</language><rights>cc_public_domain</rights><identifier>http://repository.unsri.ac.id/1415/25/RAMA_31201_03021181520007_8864000016_0025107401_01_front_ref.pdf</identifier><type>Book:Book</type><language>ind</language><rights>cc_public_domain</rights><identifier>http://repository.unsri.ac.id/1415/26/RAMA_31201_03021181520007_8864000016_0025107401_02.pdf</identifier><type>Book:Book</type><language>ind</language><rights>cc_public_domain</rights><identifier>http://repository.unsri.ac.id/1415/21/RAMA_31201_03021181520007_8864000016_0025107401_03.pdf</identifier><type>Book:Book</type><language>ind</language><rights>cc_public_domain</rights><identifier>http://repository.unsri.ac.id/1415/22/RAMA_31201_03021181520007_8864000016_0025107401_04.pdf</identifier><type>Book:Book</type><language>ind</language><rights>cc_public_domain</rights><identifier>http://repository.unsri.ac.id/1415/27/RAMA_31201_03021181520007_8864000016_0025107401_05.pdf</identifier><type>Book:Book</type><language>ind</language><rights>cc_public_domain</rights><identifier>http://repository.unsri.ac.id/1415/24/RAMA_31201_03021181520007_8864000016_0025107401_06_ref.pdf</identifier><type>Book:Book</type><language>ind</language><rights>cc_public_domain</rights><identifier>http://repository.unsri.ac.id/1415/23/RAMA_31201_03021181520007_8864000016_0025107401_07_lamp.pdf</identifier><type>Book:Book</type><language>ind</language><rights>cc_public_domain</rights><identifier>http://repository.unsri.ac.id/1415/10/RAMA_31201_03021181520007_TURNITIN.pdf</identifier><identifier> PRANATA, RENO and Toha, Taufik and Bochori, Bochori (2019) ANALISIS KETIDAKTERCAPAIAN DAN UPAYA MEMENUHI VOLUME PELEDAKAN TANAH PENUTUP DI PIT 2 DAN PIT 3 TAMBANG BATUBARA BANKO PT BUKIT ASAM TBK. Undergraduate thesis, Sriwijaya University. </identifier><recordID>1415</recordID></dc>
language ind
format Thesis:Thesis
Thesis
PeerReview:NonPeerReviewed
PeerReview
Book:Book
Book
author PRANATA, RENO
Toha, Taufik
Bochori, Bochori
title ANALISIS KETIDAKTERCAPAIAN DAN UPAYA MEMENUHI VOLUME PELEDAKAN TANAH PENUTUP DI PIT 2 DAN PIT 3 TAMBANG BATUBARA BANKO PT BUKIT ASAM TBK
publishDate 2019
isbn 0302118152000
topic TN1-997 Mining engineering. Metallurgy
url http://repository.unsri.ac.id/1415/6/RAMA_31201_03021181520007%5B1%5D.pdf
http://repository.unsri.ac.id/1415/25/RAMA_31201_03021181520007_8864000016_0025107401_01_front_ref.pdf
http://repository.unsri.ac.id/1415/26/RAMA_31201_03021181520007_8864000016_0025107401_02.pdf
http://repository.unsri.ac.id/1415/21/RAMA_31201_03021181520007_8864000016_0025107401_03.pdf
http://repository.unsri.ac.id/1415/22/RAMA_31201_03021181520007_8864000016_0025107401_04.pdf
http://repository.unsri.ac.id/1415/27/RAMA_31201_03021181520007_8864000016_0025107401_05.pdf
http://repository.unsri.ac.id/1415/24/RAMA_31201_03021181520007_8864000016_0025107401_06_ref.pdf
http://repository.unsri.ac.id/1415/23/RAMA_31201_03021181520007_8864000016_0025107401_07_lamp.pdf
http://repository.unsri.ac.id/1415/10/RAMA_31201_03021181520007_TURNITIN.pdf
http://repository.unsri.ac.id/1415/
contents Blasting at PT Bukit Asam Tbk follows the monthly blasting plan which has a blasting volume target. Several times the blasting volume target planning with the realization in the field did not match the desired results. The purpose of this research is to find out the unreachable factors and efforts that must be made to meet the target of blasting volume from the factors that cause unattainable blasting volumes. The study was conducted in the West Banko mining area. Realization for 2018 starting from November was 1,895,647 BCM for Pit 2 and 3,518,702 BCM for Pit 3. The target for blasting volume for each year in 2018 was 900,000 BCM with a realization of 492,213 BCM or 54.69% of the total. The percentage that can be said to be boulder or> 100 cm for Pit 3 is 7.24% and for Pit 2 is 3.45%, meaning that it still satisfies the fragmentation criteria that is good for both Pits using desktop 2.0 split software. The digging tool cycle time with an average time of 56.86 seconds and productivity of the digging tool was 911,057.68 BCM / month for Pit 2 and 89.93 seconds and productivity was 767,789.23 BCM / month. Factors affecting blasting volume targets are tool work efficiency, blasting geometry, rain and road conditions and lack of supervision. After the unreachable factors can be minimized by increasing work efficiency and supervision and rescheduling workdays if necessary so that the blasting volume target is 381,024 BCM / month for Pit 2 and 612,864 BCM / month for Pit 3 or can be achieved.
id IOS8119.1415
institution Universitas Sriwijaya
institution_id 177
institution_type library:university
library
library UPT Perpustakaan Universitas Sriwijaya
library_id 1098
collection Sriwijaya University Institutional Repository
repository_id 8119
city OGAN ILIR
province SUMATERA SELATAN
shared_to_ipusnas_str 1
repoId IOS8119
first_indexed 2020-03-23T07:55:09Z
last_indexed 2020-03-23T07:55:09Z
recordtype dc
_version_ 1674860783038627840
score 17.538404