Skip to content
  • Tentang IOS
  • Join Us
  • Hubungi Kami
  • Organisasi Mitra
  • Akun Anda
  • Keluar
  • Masuk
  • Bahasa Indonesia
    • Bahasa Indonesia
    • English
Lanjutan
  • Cari
  • KAJIAN TEKNIS PENGGALIAN BUCKE...
  • Preview
  • Koleksi Nasional
  • Sitasi Cantuman
  • Kirim via Email
  • Ekspor Cantuman
    • Export to RefWorks
    • Export to EndNoteWeb
    • Export to EndNote
  • Favorit
Cover Image

KAJIAN TEKNIS PENGGALIAN BUCKET WHEEL DREDGE (BWD) KUNDUR I UNTUK MENCAPAI TARGET VOLUME PEMINDAHAN TANAH SEBESAR 110.000 M3/BULAN DI UNIT PRODUKSI LAUT BANGKA, PT.TIMAH Tbk

Tersimpan di:
Main Authors: ATIKA, FIRDA, Mukiat, Mukiat, Purbasari, Diana
Format: Thesis NonPeerReviewed Book
Bahasa: ind
Terbitan: , 2018
Subjects:
TN331-347 Mine transportation
haulage and hoisting. Mining machinery
Online Access: http://repository.unsri.ac.id/11903/1/RAMA_%2031201_03021181419189_0022115801_0017048203_01_front_ref.pdf
http://repository.unsri.ac.id/11903/2/RAMA_%2031201_03021181419189_0022115801_0017048203_02.pdf
http://repository.unsri.ac.id/11903/3/RAMA_%2031201_03021181419189_0022115801_0017048203_03.pdf
http://repository.unsri.ac.id/11903/4/RAMA_%2031201_03021181419189_0022115801_0017048203_04.pdf
http://repository.unsri.ac.id/11903/5/RAMA_%2031201_03021181419189_0022115801_0017048203_05.pdf
http://repository.unsri.ac.id/11903/6/RAMA_%2031201_03021181419189_0022115801_0017048203_06.ref.pdf
http://repository.unsri.ac.id/11903/7/RAMA_%2031201_03021181419189_0022115801_0017048203_07_lamp.pdf
http://repository.unsri.ac.id/11903/
  • Lokasi
  • Deskripsi
  • Daftar Isi
  • Preview
  • Tampilan Petugas

Lihat Juga

  • EVALUASI PENGGUNAAN ALAT GALI MUAT DAN ALAT ANGKUT UNTUK MENCAPAI TARGET PRODUKSI 500.000 TON/BULAN DI MUARA TIGA BESAR UTARA PT. BUKIT ASAM (PERSERO), TBK
    oleh: DENI, YOGI RAHMA, et al.
    Terbitan: (2018)
  • ANALISIS PRODUKTIVITAS ALAT GALI MUAT BACKHOE PC 400 UNTUK MEMENUHI TARGET PRODUKSI BATUBARA 600.000 TON/BULAN DI MUARA TIGA BESAR UTARA PT.BUKIT ASAM TBK TANJUNG ENIM SUMATERA SELATAN
    oleh: LUBIS, RAJA FAIZAL, et al.
    Terbitan: (2019)
  • ANALISIS BIAYA PENGUPASAN DAN PENGANGKUTAN OVERBURDEN DENGAN TARGET PRODUKSI 400.000 BCM/BULAN DI PIT 3 TIMUR BANKO BARAT PT BUKIT ASAM (PERSERO), TBK
    oleh: AL KAUTSAR, AL KAUTSAR, et al.
    Terbitan: (2018)
  • KAJIAN TEKNIS PRODUKTIVITAS HAMMER CRUSHER TUBAN 1 UNTUK MENCAPAI TARGET PRODUKSI BATU KAPUR SEBESAR 425.250 TON/BULAN DI PT SEMEN INDONESIA (PERSERO) TBK KABUPATEN TUBAN
    oleh: FAHRUDIN, AHMAD, et al.
    Terbitan: (2018)
  • KAJIAN TEKNIS PERENCANAAN SIZE REDUCTION BATUKAPUR PADA UNIT CRUSHING PLANT PABRIK OPERASI 1 UNTUK MENCAPAI TARGET PRODUKSI DI PT SEMEN BATURAJA (PERSERO) Tbk, BATURAJA, SUMATERA SELATAN
    oleh: PUTERA, RAIHAN YARRI, et al.
    Terbitan: (2018)

Opsi Pencarian

  • Sejarah Pencarian
  • Pencarian Lanjut

Temukan Lebih Banyak

  • Penelusuran Katalog
  • Penelusuran Alfabetis

Butuh Bantuan?

  • Tips Pencarian
  • Admin
  • Hubungi Kami
© 2025 Perpustakaan Nasional Republik Indonesia
Loading...