Skip to content
Toggle navigation
Tentang IOS
Join Us
Hubungi Kami
Organisasi Mitra
Akun Anda
Keluar
Masuk
Bahasa Indonesia
Bahasa Indonesia
English
Semua Kolom
Judul
Pengarang
Subject
Call Number
ISBN/ISSN
Tag
Cari
Lanjutan
Cari
STUDI PEMANFAATAN TEKNOLOGI TE...
Preview
Koleksi Nasional
Sitasi Cantuman
Kirim via Email
Ekspor Cantuman
Export to RefWorks
Export to EndNoteWeb
Export to EndNote
Favorit
STUDI PEMANFAATAN TEKNOLOGI TERRESTRIAL LASER SCANNER UNTUK MENGHITUNG VOLUME PENGUPASAN OVERBURDEN DI PIT 2 ELEKTRIFIKASI BANKO BARAT PT. BUKIT ASAM, TBK. TANJUNG ENIM, SUMATERA SELATAN
Tersimpan di:
Main Authors:
MAHARFI, EZIL DEFRI
,
Arief, A. Taufik
,
Purbasari, Diana
Format:
Thesis
NonPeerReviewed
Book
Bahasa:
ind
Terbitan:
,
2018
Subjects:
TN331-347 Mine transportation
haulage and hoisting. Mining machinery
Online Access:
http://repository.unsri.ac.id/11901/1/RAMA_31201_03021181419025_0009096303_0017048203_01_front_ref.pdf
http://repository.unsri.ac.id/11901/2/RAMA_31201_03021181419025_0009096303_0017048203_02.pdf
http://repository.unsri.ac.id/11901/3/RAMA_31201_03021181419025_0009096303_0017048203_03.pdf
http://repository.unsri.ac.id/11901/4/RAMA_31201_03021181419025_0009096303_0017048203_04.pdf
http://repository.unsri.ac.id/11901/5/RAMA_31201_03021181419025_0009096303_0017048203_05.pdf
http://repository.unsri.ac.id/11901/6/RAMA_31201_03021181419025_0009096303_0017048203_06.ref.pdf
http://repository.unsri.ac.id/11901/7/RAMA_31201_03021181419025_0009096303_0017048203_07_lamp.pdf
http://repository.unsri.ac.id/11901/
Lokasi
Deskripsi
Daftar Isi
Preview
Tampilan Petugas
Lihat Juga
ANALISIS PERBANDINGAN CYCLE TIME DUMPTRUCK SECARA TEORITIS, DAN AKTUAL PADA PENGUPASAN OVERBURDEN DI TAMBANG BATUBARA BANKO BARAT PIT 3 BUKIT ASAM Tbk, TANJUNG ENIM SUMATERA SELATAN
oleh: FEBRIANSYAH, BILLY, et al.
Terbitan: (2019)
STUDI BIAYA PENGUPASAN OVERBURDEN PER BCM PADA PENAMBANGAN ELEKTRIFIKASI DI PIT 2 BANKO BARAT PT BUKIT ASAM TBK TANJUNG ENIM SUMATERA SELATAN
oleh: RAMADHAN, MUHAMMAD ILHAM, et al.
Terbitan: (2020)
KAJIAN TEKNIS ALAT GALI MUAT DAN ALAT ANGKUT PENGUPASAN OVERBURDEN DI PIT MUARA TIGA BESAR UTARA PT. BUKIT ASAM (PERSERO) Tbk, TANJUNG ENIM, SUMATERA SELATAN
oleh: WIRATAMA, ANDHERLYAN RENDI, et al.
Terbitan: (2018)
KAJIAN TEKNIS GEOMETRI JALAN ANGKUT HD 465 PRODUKSI OVERBURDEN DARI FRONT PENAMBANGAN-DISPOSAL AREA PADA PENAMBANGAN BANKO BARAT PT. BUKIT ASAM TBK TANJUNG ENIM SUMATERA SELATAN
oleh: FAUZAN, ACHMAD, et al.
Terbitan: (2019)
KAJIAN KEEKONOMIAN INVESTASI PENGADAAN PERALATAN BERAT TAMBANG UNTUK RENCANA PENAMBANGAN BATUBARA PERIODE 2018–2022 DI PIT 2 BANKO BARAT UPTE PT. BUKIT ASAM TBK. TANJUNG ENIM SUMATERA SELATAN
oleh: WIBAWA, KOMANG SUTA, et al.
Terbitan: (2018)
×
Loading...