13 production systems of a housing (50 units) project in Mexico over 235 days

Main Author: Antunes, Ricardo
Other Authors: González, Vicente
Format: Dataset
Terbitan: Mendeley , 2016
Subjects:
Online Access: https:/data.mendeley.com/datasets/cd63ngjrtm
ctrlnum 0.17632-cd63ngjrtm.2
fullrecord <?xml version="1.0"?> <dc><creator>Antunes, Ricardo</creator><title>13 production systems of a housing (50 units) project in Mexico over 235 days</title><publisher>Mendeley</publisher><description>Study using 13 production systems of a housing project in Mexico over 235 days. The production systems are divided into two groups: Case A and Case B. Case A gathers six production systems and Case B seven. In both cases, the production systems are arranged in a way that the output of a system is the input of the subsequent system as in a queuing system. The inputs/outputs are jobs that comprehend in a few activities assigned to a crew. For instance, the crew assigned to the job ja0 should complete the foundation, excavation, and backfill of each house. Once the crew finishes ja0 of the house, it moves to the next house leaving room for the next crew, which was assigned to ja1, and so on until all the 50 houses are completed. For this example, ja0 is the input of the production system A1, and ja1 is the output. </description><subject>Construction Management</subject><contributor>Gonz&#xE1;lez, Vicente</contributor><type>Other:Dataset</type><identifier>10.17632/cd63ngjrtm.2</identifier><rights>Creative Commons Attribution 4.0 International</rights><rights>http://creativecommons.org/licenses/by/4.0</rights><relation>https:/data.mendeley.com/datasets/cd63ngjrtm</relation><date>2016-11-29T21:39:47Z</date><recordID>0.17632-cd63ngjrtm.2</recordID></dc>
format Other:Dataset
Other
author Antunes, Ricardo
author2 González, Vicente
title 13 production systems of a housing (50 units) project in Mexico over 235 days
publisher Mendeley
publishDate 2016
topic Construction Management
url https:/data.mendeley.com/datasets/cd63ngjrtm
contents Study using 13 production systems of a housing project in Mexico over 235 days. The production systems are divided into two groups: Case A and Case B. Case A gathers six production systems and Case B seven. In both cases, the production systems are arranged in a way that the output of a system is the input of the subsequent system as in a queuing system. The inputs/outputs are jobs that comprehend in a few activities assigned to a crew. For instance, the crew assigned to the job ja0 should complete the foundation, excavation, and backfill of each house. Once the crew finishes ja0 of the house, it moves to the next house leaving room for the next crew, which was assigned to ja1, and so on until all the 50 houses are completed. For this example, ja0 is the input of the production system A1, and ja1 is the output.
id IOS7969.0.17632-cd63ngjrtm.2
institution Universitas Islam Indragiri
affiliation onesearch.perpusnas.go.id
institution_id 804
institution_type library:university
library
library Teknologi Pangan UNISI
library_id 2816
collection Artikel mulono
repository_id 7969
city INDRAGIRI HILIR
province RIAU
shared_to_ipusnas_str 1
repoId IOS7969
first_indexed 2020-04-08T08:33:36Z
last_indexed 2020-04-08T08:33:36Z
recordtype dc
_version_ 1686587852987564032
score 17.538404