Cost and Time Optimalization on the Implementation of Building Construction Project
Main Authors: | Prihanto, Yulius Teguh, Azis, Subandiyah, Iskandar, Tiong |
---|---|
Format: | Article PeerReviewed Book |
Bahasa: | eng |
Terbitan: |
Russian Federation European Researcher
, 2017
|
Subjects: | |
Online Access: |
http://eprints.itn.ac.id/5185/1/1506594442.pdf http://eprints.itn.ac.id/5185/ |
Daftar Isi:
- The aims of the research are 1) to analyze the cost of work for Building A of Christian Center Samarinda project based on historical data by using simulation technique (Monte Carlo method), 2) to analyze the duration of Building A Christian Center Samarinda project based on historical data by using simulation technique (linear programming and simulation method). This research uses descriptive method. Descriptive method can be interpreted as a problem-solving procedure investigated by describing the state of the subject or object in the research, it can be people, institutions, communities and others at current time which are based on facts as the way they are. The results of this research are 1) the final cost of the construction project of Building A Christian Center Samarinda based on historical data by using simulation technique (Monte Carlo method) is IDR 23.257.368.872,85 with the addition of operating cost of IDR 129.408.041,65 from the Budget Plan for the implementation of IDR 22.726.159136,00, 2) the implementation time of construction project of Building A Christian Center Samarinda based on historical data by using simulation technique (linear programming and simulation method) is 115 days, or there is an accelerated of the duration as long as 35 days from the implementation time of 150-days calendar. Therefore, it obtains deviation value of IDR 11.480.048,43 per day.