Analysis Of Scheduling Acceleration Of Worship Building Construction In Dili Timor-Leste Using Time Cost Trade Off (TCTO) Method
Main Authors: | Maia, Jaime Ximenes Soares, Mulyadi, Lalu, Putanto, Edi Hargono Dwi |
---|---|
Format: | Article PeerReviewed Book |
Bahasa: | eng |
Terbitan: |
International Journal of Scientific & Technology Researc
, 2018
|
Subjects: | |
Online Access: |
http://eprints.itn.ac.id/3534/1/Analysis-Of-Scheduling-Acceleration-Of-Worship-Building-Construction-In-Dili-Timor-leste-Using-Time-Cost-Trade-Off-tcto-Method.pdf http://eprints.itn.ac.id/3534/2/14.%20Lamp.%20III.A.3c-5.pdf http://eprints.itn.ac.id/3534/3/15.pdf http://eprints.itn.ac.id/3534/ http://www.ijstr.org |
Internet
http://eprints.itn.ac.id/3534/1/Analysis-Of-Scheduling-Acceleration-Of-Worship-Building-Construction-In-Dili-Timor-leste-Using-Time-Cost-Trade-Off-tcto-Method.pdfhttp://eprints.itn.ac.id/3534/2/14.%20Lamp.%20III.A.3c-5.pdf
http://eprints.itn.ac.id/3534/3/15.pdf
http://eprints.itn.ac.id/3534/
http://www.ijstr.org
Lokasi
Koleksi | Eprints ITN Malang |
---|---|
Gedung | Perpustakaan Institut Teknologi Nasional Malang |
Institusi | Institut Teknologi Nasional Malang |
Kota | KOTA MALANG |
Provinsi | JAWA TIMUR |
Kontak | Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini. |