Analysis Of Scheduling Acceleration Of Worship Building Construction In Dili Timor-Leste Using Time Cost Trade Off (TCTO) Method

Main Authors: Maia, Jaime Ximenes Soares, Mulyadi, Lalu, Putanto, Edi Hargono Dwi
Format: Article PeerReviewed Book
Bahasa: eng
Terbitan: International Journal of Scientific & Technology Researc , 2018
Subjects:
Online Access: http://eprints.itn.ac.id/3534/1/Analysis-Of-Scheduling-Acceleration-Of-Worship-Building-Construction-In-Dili-Timor-leste-Using-Time-Cost-Trade-Off-tcto-Method.pdf
http://eprints.itn.ac.id/3534/2/14.%20Lamp.%20III.A.3c-5.pdf
http://eprints.itn.ac.id/3534/3/15.pdf
http://eprints.itn.ac.id/3534/
http://www.ijstr.org
Daftar Isi:
  • Planning is the most significant part to achieve success of construction project. The planning itself towards construction project has an impact on revenue in the project itself. Frequently, a project must be completed sooner than its normal time. In this case, the project leader is expected to issue how to accelerate the completion of the project with a minimum cost. The objectives that are expected to achieve from this research are: 1) analyzing the normal time scheduling?, 2) analyzing the scheduling acceleration of the development 3) analyzing changes in the cost increase in development. From the acceleration with time cost trade off (TCTO) method on a worship building project in Dili Timor-Leste, it is optimum to be able to reduce the time duration by adding resources/working groups, and having project cost increase. In the worship building construction project in Dili Timor-Leste, the initial duration of the project is 223 days and it is changed to 181 days, so that there are 34 days of difference from the normal schedule of the project. Where under normal schedule condition, the normal cost obtained is $377.552.868, thus after doing acceleration analysis with time cost trade off (TCTO) method on the project, there is an additional direct cost in the project of $1.123,08 so that the total project cost is $ 378.675,95.