ANALISIS NILAI HASIL (EARNED VALUE ANALYSIS) TERHADAP PENGENDALIAN WAKTU DAN BIAYA PADA PEKERJAAN PROYEK PEMBANGUNAN GEDUNG (Studi Kasus Pembangunan Gedung Type B Gedung Wanita Kalibokor)

Main Author: LUCYA OCTAFIANI, LUCYA OCTAFIANI
Format: Bachelors NonPeerReviewed Book
Bahasa: ind
Terbitan: , 2019
Online Access: http://repository.unim.ac.id/336/1/LUCYA%20JURNAL.pdf
http://repository.unim.ac.id/336/2/skripsi%20cd.pdf
http://repository.unim.ac.id/336/
Daftar Isi:
  • ABSTRACT Octafiani, Lucya, 2018. Earned Value Analysis on project control and funding (Type B Building Kalibokor Women's Building). Thesis, Accounting Study Program, Faculty of Economics, Majapahit Islamic University (UNIM). Advisor I : Drs. Supriadi, M.Sc. Supervisor II : Nurdiana Fitri Isnaini, SE., MM Project work, planning and cost and time control are part of the overall construction project management. To avoid can be done well with aspects of cost and time with results. Earned Value Analysis is one method that can be used to calculate costs in terms of cost and time well. This study aims to determine the performance of costs and time each month and predict the costs and time to be able to process the work done to find what will be done for the progress of the project. The method used is Earned Value Analysis with field data on the construction of Type B Building (Kalibokor Women's Building) in Surabaya. The results of the analysis of the SPI value building project are 1 while the CPI value is 1.246698231 which means the results are carried out right from the schedule at a cost smaller than the budget. ETC value is Rp. 0 and EAC value of Rp. 953,573,984. Keywords: Earned Value Analysis, Time and Cost Control