PENETAPAN STANDAR WAKTU PROSES PRODUKSI PAKAIAN SERAGAM SEKOLAH MENEGAH ATAS(STUDI KASUS ADIGUNA TAILOR DAN ELWIS TAILOR SEBAGAI OBJEK PEMBANDING)

Main Authors: Saputra, Deby Purnandes , Warsono, Sri
Format: Thesis NonPeerReviewed Book
Bahasa: eng
Terbitan: , 2014
Subjects:
Online Access: http://repository.unib.ac.id/8250/1/I%2CII%2CIII%2CI-14-deb-FE.pdf
http://repository.unib.ac.id/8250/2/IV%2CV%2CLAMP%2CI-14-deb-FE.pdf
http://repository.unib.ac.id/8250/
Daftar Isi:
  • This research had purposed to know standard timing process to producing high school unifrom such as size M for white unifrom and size 78 for grey long pants.The working time doing with study of times to searcing average of time, normal of time and stock of time then getting standard timing process.Standard timing process was founded of Adiguna taylor and Elwis taylor can be minimize the unproductive time percentage by improve repairing labour management company.Standart timing process was founded of Adiguna taylor were chlothes 40.596 minutes, pantes 32,235 minutes. Mean while in Elwis taylor was founded that 47,69 minutes,pants 42,89 minutes.