METODE PEKERJAAN BALOK DAN PELAT LANTAI UNTUK BANGUNAN PROYEK OFFICE TOWER 2 CIPUTRA INTERNATIONAL – JAKARTA BARAT

Main Author: FIRDAUS, M.
Format: Thesis NonPeerReviewed Book
Bahasa: ind
Terbitan: , 2020
Subjects:
Online Access: http://repository.mercubuana.ac.id/55895/1/01.COVER.pdf
http://repository.mercubuana.ac.id/55895/2/08.ABSTRAK.pdf
http://repository.mercubuana.ac.id/55895/3/02.LEMBAR%20PERNYATAAN.pdf
http://repository.mercubuana.ac.id/55895/4/03.LEMBAR%20PENGESAHAN.pdf
http://repository.mercubuana.ac.id/55895/5/04.KATA%20PENGANTAR.pdf
http://repository.mercubuana.ac.id/55895/6/05.DAFTAR%20ISI.pdf
http://repository.mercubuana.ac.id/55895/7/07.DAFTAR%20TABEL.pdf
http://repository.mercubuana.ac.id/55895/8/06.DAFTAR%20GAMBAR.pdf
http://repository.mercubuana.ac.id/55895/9/09.Bab%20%20I%20-%20Pendahuluan%20REV.pdf
http://repository.mercubuana.ac.id/55895/10/10.Bab%20%20II%20-%20DATA%20PROYEK.pdf
http://repository.mercubuana.ac.id/55895/11/11.Bab%20%20III%20-%20SISTEM%20ORGANISASI%20DAN%20MANAJEMEN%20PROYEK.pdf
http://repository.mercubuana.ac.id/55895/12/12.Bab%20IV%20-%20Tujuan%20Bahan%20Bangunan%20Dan%20Alat.pdf
http://repository.mercubuana.ac.id/55895/13/13.Bab%20%20V%20-%20PELAKSANAAN%20PEKERJAAN.pdf
http://repository.mercubuana.ac.id/55895/14/14.Bab%20VI%20-%20LAPORAN%20KEMAJUAN%20PEKERJAAN%20DAN%20PENGENDALIAN%20PROYEK.pdf
http://repository.mercubuana.ac.id/55895/15/15.Bab%20%20VII%20-%20TINJAUAN%20KHUSUS%20REV.pdf
http://repository.mercubuana.ac.id/55895/16/16.Bab%20VIII%20-%20Kesimpulan.pdf
http://repository.mercubuana.ac.id/55895/17/17.DAFTAR%20PUSTAKA.pdf
http://repository.mercubuana.ac.id/55895/18/18.LAMPIRAN.pdf
http://repository.mercubuana.ac.id/55895/
ctrlnum 55895
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://repository.mercubuana.ac.id/55895/</relation><title>METODE PEKERJAAN BALOK DAN PELAT LANTAI UNTUK BANGUNAN PROYEK OFFICE TOWER 2 CIPUTRA INTERNATIONAL &#x2013; JAKARTA BARAT</title><creator>FIRDAUS, M.</creator><subject>022.3 Buildings/Bangunan</subject><subject>069.22 Planning for Buildings/Merencanakan Bangunan</subject><subject>620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan</subject><subject>624 Civil Engineering/Teknik Sipil</subject><subject>624.9 Building, Structure, and Installation/Bangunan, Struktur, dan Instalasi</subject><description>Proyek Office Tower 2 Ciputra International &#x2013; Jakarta Barat, merupakan salah satu&#xD; proyek yang dibangun dengan konsep perkantoran pada umumnya. Proyek Office&#xD; Tower 2 Ciputra International itu sendiri merupakan bangunan perkantoran (Office)&#xD; dibangun dalam Rencana Kawasan CBD Central Bisnis Distrik Ciputra.&#xD; Seiring dengan kebutuhan dan keperluan tempat tinggal juga perkantoran yang&#xD; semakin meningkat, PT Ciputra Development Tbk sebagai owner mewujudkan&#xD; suatu bangunan perkantoran pada lokasi yang strategis, nyaman dan memiliki&#xD; fasilitas penunjang perekonomian di daerah Rawa Buaya, Kembangan &#x2013; Jakarta&#xD; Barat.&#xD; Dalam konstruksi bangunan bertingkat seperti halnya pada Proyek Office Tower 2&#xD; Ciputra International, tentu saja tidak luput dari pekerjaan balok dan pelat lantai.&#xD; Dan untuk urutan pekerjaan nya dimulai dari pekerjaan persiapan seperti survey&#xD; lokasi proyek dan proses IMB, site planning, pembuatan shop drawing (gambar&#xD; kerja), perhitungan kebutuhan sumber daya, pengadaan material dan bahan&#xD; bangunan, mobilisasi demobilisasi, pengukuran awal pelaksanaan proyek. Dan&#xD; untuk tahap pelaksanaan, dimulai dari proses pengukuran, pemasangan scaffolding,&#xD; pemasangan bekisting, pemasangan besi sebagai tulangan, proses pengecoran,&#xD; proses perawatan beton serta proses pembongkaran bekisting.&#xD; Kata Kunci : Metode Pelaksanaan, Balok, Pelat Lantai</description><date>2020-06-05</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55895/1/01.COVER.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55895/2/08.ABSTRAK.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55895/3/02.LEMBAR%20PERNYATAAN.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55895/4/03.LEMBAR%20PENGESAHAN.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55895/5/04.KATA%20PENGANTAR.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55895/6/05.DAFTAR%20ISI.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55895/7/07.DAFTAR%20TABEL.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55895/8/06.DAFTAR%20GAMBAR.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55895/9/09.Bab%20%20I%20-%20Pendahuluan%20REV.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55895/10/10.Bab%20%20II%20-%20DATA%20PROYEK.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55895/11/11.Bab%20%20III%20-%20SISTEM%20ORGANISASI%20DAN%20MANAJEMEN%20PROYEK.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55895/12/12.Bab%20IV%20-%20Tujuan%20Bahan%20Bangunan%20Dan%20Alat.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55895/13/13.Bab%20%20V%20-%20PELAKSANAAN%20PEKERJAAN.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55895/14/14.Bab%20VI%20-%20LAPORAN%20KEMAJUAN%20PEKERJAAN%20DAN%20PENGENDALIAN%20PROYEK.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55895/15/15.Bab%20%20VII%20-%20TINJAUAN%20KHUSUS%20REV.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55895/16/16.Bab%20VIII%20-%20Kesimpulan.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55895/17/17.DAFTAR%20PUSTAKA.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55895/18/18.LAMPIRAN.pdf</identifier><identifier> FIRDAUS, M. (2020) METODE PEKERJAAN BALOK DAN PELAT LANTAI UNTUK BANGUNAN PROYEK OFFICE TOWER 2 CIPUTRA INTERNATIONAL &#x2013; JAKARTA BARAT. S1-Sarjana thesis, Universitas Mercu Buana Jakarta. </identifier><recordID>55895</recordID></dc>
language ind
format Thesis:Thesis
Thesis
PeerReview:NonPeerReviewed
PeerReview
Book:Book
Book
author FIRDAUS, M.
title METODE PEKERJAAN BALOK DAN PELAT LANTAI UNTUK BANGUNAN PROYEK OFFICE TOWER 2 CIPUTRA INTERNATIONAL – JAKARTA BARAT
publishDate 2020
topic 022.3 Buildings
Bangunan
069.22 Planning for Buildings
Merencanakan Bangunan
620 Engineering and Applied Operations
Ilmu Teknik dan operasi Terapan
624 Civil Engineering
Teknik Sipil
624.9 Building
Structure
and Installation/Bangunan
Struktur
dan Instalasi
url http://repository.mercubuana.ac.id/55895/1/01.COVER.pdf
http://repository.mercubuana.ac.id/55895/2/08.ABSTRAK.pdf
http://repository.mercubuana.ac.id/55895/3/02.LEMBAR%20PERNYATAAN.pdf
http://repository.mercubuana.ac.id/55895/4/03.LEMBAR%20PENGESAHAN.pdf
http://repository.mercubuana.ac.id/55895/5/04.KATA%20PENGANTAR.pdf
http://repository.mercubuana.ac.id/55895/6/05.DAFTAR%20ISI.pdf
http://repository.mercubuana.ac.id/55895/7/07.DAFTAR%20TABEL.pdf
http://repository.mercubuana.ac.id/55895/8/06.DAFTAR%20GAMBAR.pdf
http://repository.mercubuana.ac.id/55895/9/09.Bab%20%20I%20-%20Pendahuluan%20REV.pdf
http://repository.mercubuana.ac.id/55895/10/10.Bab%20%20II%20-%20DATA%20PROYEK.pdf
http://repository.mercubuana.ac.id/55895/11/11.Bab%20%20III%20-%20SISTEM%20ORGANISASI%20DAN%20MANAJEMEN%20PROYEK.pdf
http://repository.mercubuana.ac.id/55895/12/12.Bab%20IV%20-%20Tujuan%20Bahan%20Bangunan%20Dan%20Alat.pdf
http://repository.mercubuana.ac.id/55895/13/13.Bab%20%20V%20-%20PELAKSANAAN%20PEKERJAAN.pdf
http://repository.mercubuana.ac.id/55895/14/14.Bab%20VI%20-%20LAPORAN%20KEMAJUAN%20PEKERJAAN%20DAN%20PENGENDALIAN%20PROYEK.pdf
http://repository.mercubuana.ac.id/55895/15/15.Bab%20%20VII%20-%20TINJAUAN%20KHUSUS%20REV.pdf
http://repository.mercubuana.ac.id/55895/16/16.Bab%20VIII%20-%20Kesimpulan.pdf
http://repository.mercubuana.ac.id/55895/17/17.DAFTAR%20PUSTAKA.pdf
http://repository.mercubuana.ac.id/55895/18/18.LAMPIRAN.pdf
http://repository.mercubuana.ac.id/55895/
contents Proyek Office Tower 2 Ciputra International – Jakarta Barat, merupakan salah satu proyek yang dibangun dengan konsep perkantoran pada umumnya. Proyek Office Tower 2 Ciputra International itu sendiri merupakan bangunan perkantoran (Office) dibangun dalam Rencana Kawasan CBD Central Bisnis Distrik Ciputra. Seiring dengan kebutuhan dan keperluan tempat tinggal juga perkantoran yang semakin meningkat, PT Ciputra Development Tbk sebagai owner mewujudkan suatu bangunan perkantoran pada lokasi yang strategis, nyaman dan memiliki fasilitas penunjang perekonomian di daerah Rawa Buaya, Kembangan – Jakarta Barat. Dalam konstruksi bangunan bertingkat seperti halnya pada Proyek Office Tower 2 Ciputra International, tentu saja tidak luput dari pekerjaan balok dan pelat lantai. Dan untuk urutan pekerjaan nya dimulai dari pekerjaan persiapan seperti survey lokasi proyek dan proses IMB, site planning, pembuatan shop drawing (gambar kerja), perhitungan kebutuhan sumber daya, pengadaan material dan bahan bangunan, mobilisasi demobilisasi, pengukuran awal pelaksanaan proyek. Dan untuk tahap pelaksanaan, dimulai dari proses pengukuran, pemasangan scaffolding, pemasangan bekisting, pemasangan besi sebagai tulangan, proses pengecoran, proses perawatan beton serta proses pembongkaran bekisting. Kata Kunci : Metode Pelaksanaan, Balok, Pelat Lantai
id IOS5909.55895
institution Universitas Mercu Buana
institution_id 134
institution_type library:university
library
library Perpustakaan Universitas Mercu Buana
library_id 542
collection Repository Universitas Mercu Buana
repository_id 5909
subject_area Econmics/Ilmu Ekonomi
Communication/Komunikasi
Engineering/Ilmu Teknik
Measurement/Teknik Desain, Pengujian, Pengukuran, Kualitas, Perawatan, Pemeliharaan, Perbaikan
city Jakarta Barat
province DKI JAKARTA
shared_to_ipusnas_str 1
repoId IOS5909
first_indexed 2020-06-16T14:17:36Z
last_indexed 2020-06-16T14:17:36Z
recordtype dc
_version_ 1685794935988551680
score 17.538404