Skip to content
Toggle navigation
Tentang IOS
Join Us
Hubungi Kami
Organisasi Mitra
Akun Anda
Keluar
Masuk
Bahasa Indonesia
Bahasa Indonesia
English
Semua Kolom
Judul
Pengarang
Subject
Call Number
ISBN/ISSN
Tag
Cari
Lanjutan
Cari
KAJIAN WAKTU PELAKSANAAN PEKER...
Deskripsi
Koleksi Nasional
Sitasi Cantuman
Kirim via Email
Ekspor Cantuman
Export to RefWorks
Export to EndNoteWeb
Export to EndNote
Favorit
KAJIAN WAKTU PELAKSANAAN PEKERJAAN BASEMENT MENGGUNAKAN METODE TOP DOWN SEBAGAI PENGGANTI METODE BOTTOM UP PADA PROYEK THE PAKUBUWONO MENTENG
Tersimpan di:
Main Author:
SAPUTRI, MARLIANA EKA
Format:
Thesis
NonPeerReviewed
Book
Bahasa:
ind
Terbitan:
,
2020
Subjects:
069.22 Planning for Buildings
Merencanakan Bangunan
620 Engineering and Applied Operations
Ilmu Teknik dan operasi Terapan
624 Civil Engineering
Teknik Sipil
624.9 Building
Structure
and Installation/Bangunan
Struktur
dan Instalasi
Online Access:
http://repository.mercubuana.ac.id/55880/1/1.%20JUDUL.pdf
http://repository.mercubuana.ac.id/55880/2/2.%20ABSTRAK.pdf
http://repository.mercubuana.ac.id/55880/3/3.%20LEMBAR%20PERNYATAAN.pdf
http://repository.mercubuana.ac.id/55880/4/4.%20LEMBAR%20PENGESAHAN.pdf
http://repository.mercubuana.ac.id/55880/5/5.%20KATA%20PENGANTAR.pdf
http://repository.mercubuana.ac.id/55880/6/6.%20DAFTAR%20ISI.pdf
http://repository.mercubuana.ac.id/55880/7/7.%20DAFTAR%20TABEL.pdf
http://repository.mercubuana.ac.id/55880/8/8.%20DAFTAR%20GAMBAR.pdf
http://repository.mercubuana.ac.id/55880/9/9.%20DAFTAR%20LAMPIRAN.pdf
http://repository.mercubuana.ac.id/55880/11/10.%20BAB%201.pdf
http://repository.mercubuana.ac.id/55880/10/11.%20BAB%202.pdf
http://repository.mercubuana.ac.id/55880/12/12.%20BAB%203.pdf
http://repository.mercubuana.ac.id/55880/13/13.%20BAB%204.pdf
http://repository.mercubuana.ac.id/55880/14/14.%20BAB%205.pdf
http://repository.mercubuana.ac.id/55880/15/15.%20DAFTAR%20PUSTAKA.pdf
http://repository.mercubuana.ac.id/55880/16/16.%20LAMPIRAN.pdf
http://repository.mercubuana.ac.id/55880/
Lokasi
Deskripsi
Daftar Isi
Preview
Tampilan Petugas
Description not available.
Lihat Juga
PELAKSANAAN PEKERJAAN STRUKTUR BASEMENT MENGGUNAKAN METODE TOP DOWN PROYEK INDONESIA 1
oleh: PUTRANTO, DAVID
Terbitan: (2019)
ANALISIS QUANTITY TAKE OFF DAN HARGA SATUAN PADA ITEM PEKERJAAN PENYEBAB DEVIASI BIAYA PELAKSANAAN BASEMENT METODE SEMI TOPDOWN TERHADAP BUDGET PADA PROYEK THE PAKUBUWONO MENTENG
oleh: WIJAYA, AHMAD PUTRA
Terbitan: (2019)
METODE PELAKSANAAN PEKERJAAN KOLOM PADA PROYEK MPP OFFICE BUILDING
oleh: KRISTIAWAN, PRASETYO
Terbitan: (2019)
EVALUASI PEKERJAAN INSTALASI FASAD CURTAIN WALL UNITIZED SYSTEM PADA BANGUNAN TWIST BUILDING DENGAN METODE OPERASI KONSTRUKSI BERULANG (CYCLONE) (Studi Kasus : Proyek Avian Tower Surabaya)
oleh: ADRIYATNO, JIMMY
Terbitan: (2018)
LAPORAN KERJA PRAKTEK METODE PELAKSANAAN PEKERJAAN STRUKTUR PLAT LANTAI DAN BALOK PROYEK PEMBANGUNAN RUSUN NAGRAK TOWER 6-10 CILINCING JAKARTA UTARA
oleh: WAHONO, NANANG ASEP
Terbitan: (2018)
×
Loading...