fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://repository.mercubuana.ac.id/55845/</relation><title>ANALISIS DROP TEGANGAN SEBELUM DAN SESUDAH PENAMBAHAN FEEDERBARU PADA JARINGAN TEGANGAN RENDAHDI PT.PLN (PERSERO) UP3 KEBON JERUK</title><creator>SUJARWADI, TITO</creator><subject>005.754 Network Databases/Pangakalan Data Jaringan</subject><subject>530 Physics/Fisika</subject><subject>537 Electricity/Fisika Listrik</subject><subject>537.6 Electrodinamics, Electric Current/Elektrodinamik, Arus Listrik</subject><description>Electricity problems that are often felt by the community are the problem of voltage drop. One of the areas experiencing a voltage drop problem is the Aries Kencana residential area. Voltage drop on customers in this area exceeds 10% of the standards allowed by PLN (SPLN No.1 Year 1995). The measured voltage at 12.00 is 200 V and at night when the peak load at 19.00 is 180 V and occurs at the customer locationat the end of the Low Voltage Network. With very low voltageproblem, electrical equipment to customers and electronic devices will be damaged quickly. At 19:00 when a peak load occurs, consumers cannot turn on the TV, radio, refrigerator and other electronic devices.The method of adding a new feeder by dividing the load on the network side and transferring the network is an attempt to improve the voltage drop. This analysis is carried out by using technical data and measurements to obtain the results of service voltage quality according to standards and reduce the impact of voltage drop.From the results of the calculation analysis on SP 123 substation, the voltage drop that occurs in Aries Kencana residentiualis caused by a network that is too long, and the load accumulates on one feeder. The voltage drop obtained from the measurement before the addition of the feeder is 50 volts with a percentage of 21.7% exceeding the tolerance limit permitted by the SPLN. By adding a new network and carrying out a reduction of the calculated load of 37.66 Amperwill be able to press the voltage drop up to 6,3%. The voltage drop that occurs does not exceed the conditions required by the SPLNKeyword : Low Voltage Network, Voltage Drop, AddingNew Feeder&#xD; &#xD; Permasalahan listrik yang sering dirasakan oleh masyarakat adalah masalah drop tegangan. Salah satu daerah yang mengalami masalah drop tegangan adalah daerah perumahan Aries Kencana. Droptegangan pada pelanggan di daerah ini melebihi 10% dari standar yang diperbolehkanPLN (SPLN No.1 Tahun 1995).Tegangan listrik yang terukur pada siang hari yaitu jam 12.00 adalah 200 V dan pada malam hari saat terjadi beban puncak jam 19.00 adalah 180 V dan terjadi pada lokasi pelanggan JTR paling ujung. Dengan tegangan yang sangat rendah maka peralatan&#x2013;peralatan listrik pada pelanggan dan alat-alat elektronika akan menjadi cepat rusak. Pada jam 19:00 saat terjadi beban puncak, konsumen tidak bisa menyalakan TV, radio, kulkas dan alat elektronik lainnya.Metodepenambahan feederbaru dengan pembagian beban di sisi jaringandan pengalihan jaringan merupakan suatuupaya untuk memperbaiki droptegangan.Analisis ini dilakukan dengan menggunakan data-data teknik dan pengukuran untuk mendapatkan hasil kualitas tegangan pelayanan sesuai standar dan mengurangi dampak droptegangan.Dari hasil analisis perhitungan pada gardu SP 123,Drop tegangan yang terjadi di perumahan Aries Kencanadisebabkan olehjaringan terlalu panjang, dan beban yang menumpuk pada satu feeder. Drop tegangan yang diperoleh dari pengukuran sebelum dilakukannya penambahan feederadalah sebesar 50 volt dengan persentase 21,7 %melampaui batas toleransi yang diizinkan oleh SPLN. Dengan menambah jaringan baru dan melakukan pengurangan beban yang terhitung sebesar 37,66 A akan dapat menekan drop tegangan hingga 6,3%.Drop tegangan yang terjadi ini tidak melebihi ketentuan yang disyaratkan oleh SPLNKata Kunci: Jaringan Tegangan Rendah, DropTegangan, Penambahan Feeder</description><date>2020-05-18</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55845/1/1.HALAMAN%20JUDUL.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55845/2/5.ABSTRAK.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55845/3/2.LEMBAR%20PERNYATAAN.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55845/4/3.LEMBAR%20PENGESAHAN.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55845/5/4.KATA%20PENGANTAR.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55845/6/6.DAFTAR%20ISI.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55845/7/7.DAFTAR%20TABEL.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55845/8/8.DAFTAR%20GAMBAR.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55845/9/9.DAFTAR%20LAMPIRAN.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55845/10/10.BAB%20I.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55845/11/11.BAB%20II.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55845/12/12.BAB%20III.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55845/13/13.BAB%20IV.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55845/14/14.BAB%20V.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55845/15/15.DAFTAR%20PUSTAKA.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55845/16/16.LAMPIRAN.pdf</identifier><identifier> SUJARWADI, TITO (2020) ANALISIS DROP TEGANGAN SEBELUM DAN SESUDAH PENAMBAHAN FEEDERBARU PADA JARINGAN TEGANGAN RENDAHDI PT.PLN (PERSERO) UP3 KEBON JERUK. S1-Sarjana thesis, Universitas Mercu Buana Jakarta. </identifier><recordID>55845</recordID></dc>
language ind
format Thesis:Thesis
Thesis
PeerReview:NonPeerReviewed
PeerReview
Book:Book
Book
author SUJARWADI, TITO
title ANALISIS DROP TEGANGAN SEBELUM DAN SESUDAH PENAMBAHAN FEEDERBARU PADA JARINGAN TEGANGAN RENDAHDI PT.PLN (PERSERO) UP3 KEBON JERUK
publishDate 2020
topic 005.754 Network Databases
Pangakalan Data Jaringan
530 Physics
Fisika
537 Electricity
Fisika Listrik
537.6 Electrodinamics
Electric Current/Elektrodinamik
Arus Listrik
url http://repository.mercubuana.ac.id/55845/1/1.HALAMAN%20JUDUL.pdf
http://repository.mercubuana.ac.id/55845/2/5.ABSTRAK.pdf
http://repository.mercubuana.ac.id/55845/3/2.LEMBAR%20PERNYATAAN.pdf
http://repository.mercubuana.ac.id/55845/4/3.LEMBAR%20PENGESAHAN.pdf
http://repository.mercubuana.ac.id/55845/5/4.KATA%20PENGANTAR.pdf
http://repository.mercubuana.ac.id/55845/6/6.DAFTAR%20ISI.pdf
http://repository.mercubuana.ac.id/55845/7/7.DAFTAR%20TABEL.pdf
http://repository.mercubuana.ac.id/55845/8/8.DAFTAR%20GAMBAR.pdf
http://repository.mercubuana.ac.id/55845/9/9.DAFTAR%20LAMPIRAN.pdf
http://repository.mercubuana.ac.id/55845/10/10.BAB%20I.pdf
http://repository.mercubuana.ac.id/55845/11/11.BAB%20II.pdf
http://repository.mercubuana.ac.id/55845/12/12.BAB%20III.pdf
http://repository.mercubuana.ac.id/55845/13/13.BAB%20IV.pdf
http://repository.mercubuana.ac.id/55845/14/14.BAB%20V.pdf
http://repository.mercubuana.ac.id/55845/15/15.DAFTAR%20PUSTAKA.pdf
http://repository.mercubuana.ac.id/55845/16/16.LAMPIRAN.pdf
http://repository.mercubuana.ac.id/55845/
contents Electricity problems that are often felt by the community are the problem of voltage drop. One of the areas experiencing a voltage drop problem is the Aries Kencana residential area. Voltage drop on customers in this area exceeds 10% of the standards allowed by PLN (SPLN No.1 Year 1995). The measured voltage at 12.00 is 200 V and at night when the peak load at 19.00 is 180 V and occurs at the customer locationat the end of the Low Voltage Network. With very low voltageproblem, electrical equipment to customers and electronic devices will be damaged quickly. At 19:00 when a peak load occurs, consumers cannot turn on the TV, radio, refrigerator and other electronic devices.The method of adding a new feeder by dividing the load on the network side and transferring the network is an attempt to improve the voltage drop. This analysis is carried out by using technical data and measurements to obtain the results of service voltage quality according to standards and reduce the impact of voltage drop.From the results of the calculation analysis on SP 123 substation, the voltage drop that occurs in Aries Kencana residentiualis caused by a network that is too long, and the load accumulates on one feeder. The voltage drop obtained from the measurement before the addition of the feeder is 50 volts with a percentage of 21.7% exceeding the tolerance limit permitted by the SPLN. By adding a new network and carrying out a reduction of the calculated load of 37.66 Amperwill be able to press the voltage drop up to 6,3%. The voltage drop that occurs does not exceed the conditions required by the SPLNKeyword : Low Voltage Network, Voltage Drop, AddingNew Feeder Permasalahan listrik yang sering dirasakan oleh masyarakat adalah masalah drop tegangan. Salah satu daerah yang mengalami masalah drop tegangan adalah daerah perumahan Aries Kencana. Droptegangan pada pelanggan di daerah ini melebihi 10% dari standar yang diperbolehkanPLN (SPLN No.1 Tahun 1995).Tegangan listrik yang terukur pada siang hari yaitu jam 12.00 adalah 200 V dan pada malam hari saat terjadi beban puncak jam 19.00 adalah 180 V dan terjadi pada lokasi pelanggan JTR paling ujung. Dengan tegangan yang sangat rendah maka peralatan–peralatan listrik pada pelanggan dan alat-alat elektronika akan menjadi cepat rusak. Pada jam 19:00 saat terjadi beban puncak, konsumen tidak bisa menyalakan TV, radio, kulkas dan alat elektronik lainnya.Metodepenambahan feederbaru dengan pembagian beban di sisi jaringandan pengalihan jaringan merupakan suatuupaya untuk memperbaiki droptegangan.Analisis ini dilakukan dengan menggunakan data-data teknik dan pengukuran untuk mendapatkan hasil kualitas tegangan pelayanan sesuai standar dan mengurangi dampak droptegangan.Dari hasil analisis perhitungan pada gardu SP 123,Drop tegangan yang terjadi di perumahan Aries Kencanadisebabkan olehjaringan terlalu panjang, dan beban yang menumpuk pada satu feeder. Drop tegangan yang diperoleh dari pengukuran sebelum dilakukannya penambahan feederadalah sebesar 50 volt dengan persentase 21,7 %melampaui batas toleransi yang diizinkan oleh SPLN. Dengan menambah jaringan baru dan melakukan pengurangan beban yang terhitung sebesar 37,66 A akan dapat menekan drop tegangan hingga 6,3%.Drop tegangan yang terjadi ini tidak melebihi ketentuan yang disyaratkan oleh SPLNKata Kunci: Jaringan Tegangan Rendah, DropTegangan, Penambahan Feeder
id IOS5909.55845
institution Universitas Mercu Buana
institution_id 134
institution_type library:university
library
library Perpustakaan Universitas Mercu Buana
library_id 542
collection Repository Universitas Mercu Buana
repository_id 5909
subject_area Econmics/Ilmu Ekonomi
Communication/Komunikasi
Engineering/Ilmu Teknik
Measurement/Teknik Desain, Pengujian, Pengukuran, Kualitas, Perawatan, Pemeliharaan, Perbaikan
city Jakarta Barat
province DKI JAKARTA
shared_to_ipusnas_str 1
repoId IOS5909
first_indexed 2020-05-26T03:14:53Z
last_indexed 2020-06-16T14:17:36Z
recordtype dc
_version_ 1685794935738990592
score 17.538404