ctrlnum 55828
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://repository.mercubuana.ac.id/55828/</relation><title>MODIFIKASI SISTEM GREENTIRE LOADER BERBASIS PLC PADA MESIN CURING</title><creator>FADHILAH, AZIZ HASAN</creator><subject>620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan</subject><subject>621 Applied Physics/Fisika terapan</subject><subject>621.8 Machine Engineering, Machinery/Teknik Mesin</subject><subject>653.3 Machine Systems/Sistem Mesin</subject><description>Curing process is a greentire cooking process from building become tire. At curing process has a part is greentire loader which function to hang up greentire and move it to bladder then did the process of shaping to form greentire be expands in order to be more easy to do press with mold before to a curing process. At the present time movement greentire process to bladder are still in spring manual use push button and selector that has been programmed with PLC Omron CJ1M-CPU12. The effect is caused by long process of shaping bladder that no wrapping and potential defect caused in part inner greentire or inner liner (Buckle Bladder) as requiring feeling of operator. In addition, the other effect is the cycle time of operator to handling greentire loader be long.So it needs a system modification in the greentire loaderby adding some proximity switch, separate solenoid valve, and change the PLC program. The result of the modification is success of a otomation function 99.94% and error 0.059% and reduced buckle baldder defect from May until early July 2019. In addition, cycle time the operation of greentire loader are getting faster and efficient in accordance of company standard is 2.23 minute.Keywords: Greentire Loader; PLC; Buckle BladderDefect; Cycle Time&#xD; &#xD; Proses Curing adalah proses pemasakan greentire dari building menjadi tire. Pada proses Curing terdapat bagian yang bernama loader greentire yang berfungsi untuk menggantungkan greentire dan memindahkannya ke bladderkemudian dilakukannya proses shaping untuk membentuk greentire menjadi mengembang agar lebih mudah melakukan press dengan mold sebelum dilakukan pemasakan. Pada saat ini, proses pemindahan greentire ke bladdermasih secara semi manual menggunakan push button dan selektor yang diprogram dengan PLC Omron CJ1M-CPU12. Efek yang diakibatkan adalah lamanya proses shaping agar bladder tidak melipat dan potensi mengakibatkan defect pada bagian dalam greentire atau inner liner (Buckle Bladder) karena membutuhkan feeling dari operator. Selain itu, efek lainnya adalah cycle time operator untuk handling greentire loadermenjadi lama. Sehingga diperlukannya sebuah modifikasi sistem pada bagian greentire loader yaitu dengan menambahkan beberapa proximity switch, memisahkan solenoid valve, dan mengubah program pada PLC. Hasil dari modifikasi tersebut adalah keberhasilan fungsi otomasinya sebesar 99.94% dan error 0.059% dan berkurangnya defect buckle bladderdari bulan Mei sampai dengan awal Juli 2019. Selain itu, cycle time pengoperasian grentire loader menjadi lebih cepat dan efisien sesuai dengan standard pada perusahaan yaitu 2.23 menit.Kata kunci: Greentire Loader; PLC; Defect Buckle Bladder;Cycle Time</description><date>2020-05-14</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55828/1/01.%20Halaman%20Judul.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55828/2/02.%20Abstrak.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55828/3/03.%20Surat%20Pernyataan.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55828/4/04.%20Lembar%20Pengesahan.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55828/5/05.%20Kata%20Pengantar.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55828/6/06.%20Daftar%20Isi.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55828/7/07.%20Daftar%20Tabel.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55828/8/08.%20Daftar%20Gambar.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55828/9/09.%20Bab%20I.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55828/10/10.%20Bab%20II.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55828/11/11.%20Bab%20III.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55828/12/12.%20Bab%20IV.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55828/13/13.%20Bab%20V.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55828/14/14.%20Daftar%20Pustaka.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/55828/15/15.%20Lampiran.pdf</identifier><identifier> FADHILAH, AZIZ HASAN (2020) MODIFIKASI SISTEM GREENTIRE LOADER BERBASIS PLC PADA MESIN CURING. S1-Sarjana thesis, Universitas Mercu Buana Jakarta. </identifier><recordID>55828</recordID></dc>
language ind
format Thesis:Thesis
Thesis
PeerReview:NonPeerReviewed
PeerReview
Book:Book
Book
author FADHILAH, AZIZ HASAN
title MODIFIKASI SISTEM GREENTIRE LOADER BERBASIS PLC PADA MESIN CURING
publishDate 2020
topic 620 Engineering and Applied Operations
Ilmu Teknik dan operasi Terapan
621 Applied Physics
Fisika terapan
621.8 Machine Engineering
Machinery/Teknik Mesin
653.3 Machine Systems
Sistem Mesin
url http://repository.mercubuana.ac.id/55828/1/01.%20Halaman%20Judul.pdf
http://repository.mercubuana.ac.id/55828/2/02.%20Abstrak.pdf
http://repository.mercubuana.ac.id/55828/3/03.%20Surat%20Pernyataan.pdf
http://repository.mercubuana.ac.id/55828/4/04.%20Lembar%20Pengesahan.pdf
http://repository.mercubuana.ac.id/55828/5/05.%20Kata%20Pengantar.pdf
http://repository.mercubuana.ac.id/55828/6/06.%20Daftar%20Isi.pdf
http://repository.mercubuana.ac.id/55828/7/07.%20Daftar%20Tabel.pdf
http://repository.mercubuana.ac.id/55828/8/08.%20Daftar%20Gambar.pdf
http://repository.mercubuana.ac.id/55828/9/09.%20Bab%20I.pdf
http://repository.mercubuana.ac.id/55828/10/10.%20Bab%20II.pdf
http://repository.mercubuana.ac.id/55828/11/11.%20Bab%20III.pdf
http://repository.mercubuana.ac.id/55828/12/12.%20Bab%20IV.pdf
http://repository.mercubuana.ac.id/55828/13/13.%20Bab%20V.pdf
http://repository.mercubuana.ac.id/55828/14/14.%20Daftar%20Pustaka.pdf
http://repository.mercubuana.ac.id/55828/15/15.%20Lampiran.pdf
http://repository.mercubuana.ac.id/55828/
contents Curing process is a greentire cooking process from building become tire. At curing process has a part is greentire loader which function to hang up greentire and move it to bladder then did the process of shaping to form greentire be expands in order to be more easy to do press with mold before to a curing process. At the present time movement greentire process to bladder are still in spring manual use push button and selector that has been programmed with PLC Omron CJ1M-CPU12. The effect is caused by long process of shaping bladder that no wrapping and potential defect caused in part inner greentire or inner liner (Buckle Bladder) as requiring feeling of operator. In addition, the other effect is the cycle time of operator to handling greentire loader be long.So it needs a system modification in the greentire loaderby adding some proximity switch, separate solenoid valve, and change the PLC program. The result of the modification is success of a otomation function 99.94% and error 0.059% and reduced buckle baldder defect from May until early July 2019. In addition, cycle time the operation of greentire loader are getting faster and efficient in accordance of company standard is 2.23 minute.Keywords: Greentire Loader; PLC; Buckle BladderDefect; Cycle Time Proses Curing adalah proses pemasakan greentire dari building menjadi tire. Pada proses Curing terdapat bagian yang bernama loader greentire yang berfungsi untuk menggantungkan greentire dan memindahkannya ke bladderkemudian dilakukannya proses shaping untuk membentuk greentire menjadi mengembang agar lebih mudah melakukan press dengan mold sebelum dilakukan pemasakan. Pada saat ini, proses pemindahan greentire ke bladdermasih secara semi manual menggunakan push button dan selektor yang diprogram dengan PLC Omron CJ1M-CPU12. Efek yang diakibatkan adalah lamanya proses shaping agar bladder tidak melipat dan potensi mengakibatkan defect pada bagian dalam greentire atau inner liner (Buckle Bladder) karena membutuhkan feeling dari operator. Selain itu, efek lainnya adalah cycle time operator untuk handling greentire loadermenjadi lama. Sehingga diperlukannya sebuah modifikasi sistem pada bagian greentire loader yaitu dengan menambahkan beberapa proximity switch, memisahkan solenoid valve, dan mengubah program pada PLC. Hasil dari modifikasi tersebut adalah keberhasilan fungsi otomasinya sebesar 99.94% dan error 0.059% dan berkurangnya defect buckle bladderdari bulan Mei sampai dengan awal Juli 2019. Selain itu, cycle time pengoperasian grentire loader menjadi lebih cepat dan efisien sesuai dengan standard pada perusahaan yaitu 2.23 menit.Kata kunci: Greentire Loader; PLC; Defect Buckle Bladder;Cycle Time
id IOS5909.55828
institution Universitas Mercu Buana
institution_id 134
institution_type library:university
library
library Perpustakaan Universitas Mercu Buana
library_id 542
collection Repository Universitas Mercu Buana
repository_id 5909
subject_area Econmics/Ilmu Ekonomi
Communication/Komunikasi
Engineering/Ilmu Teknik
Measurement/Teknik Desain, Pengujian, Pengukuran, Kualitas, Perawatan, Pemeliharaan, Perbaikan
city Jakarta Barat
province DKI JAKARTA
shared_to_ipusnas_str 1
repoId IOS5909
first_indexed 2020-05-26T03:14:53Z
last_indexed 2020-06-16T14:17:36Z
recordtype dc
_version_ 1685794935390863360
score 17.538404