PELAKSANAAN PEKERJAAN STRUKTUR JEMBATAN METODE SECANT PILE PROYEK TOL DEPOK-ANTASARI

Main Author: CAHYO, AHMAD NUR
Format: Thesis NonPeerReviewed Book
Bahasa: ind
Terbitan: , 2020
Subjects:
Online Access: http://repository.mercubuana.ac.id/53530/1/1.COVER.pdf
http://repository.mercubuana.ac.id/53530/2/2.ABSTRAK.pdf
http://repository.mercubuana.ac.id/53530/3/3.LEMBAR%20PERNYATAAN%20CAHYO.pdf
http://repository.mercubuana.ac.id/53530/4/4.LEMBAR%20PENGESAHAN.pdf
http://repository.mercubuana.ac.id/53530/5/5.KATA%20PENGANTAR.pdf
http://repository.mercubuana.ac.id/53530/6/6.DAFTAR%20ISI.pdf
http://repository.mercubuana.ac.id/53530/7/7.DAFTAR%20GAMBAR.pdf
http://repository.mercubuana.ac.id/53530/8/8.BAB%20I%20PENDAHULUAN.pdf
http://repository.mercubuana.ac.id/53530/9/9.BAB%20II%20DATA%20PROYEK.pdf
http://repository.mercubuana.ac.id/53530/10/10.BAB%20III%20SISTEM%20MANAJEMEN%20PROYEK.pdf
http://repository.mercubuana.ac.id/53530/11/11.BAB%20IV.pdf
http://repository.mercubuana.ac.id/53530/12/12.BAB%20V.pdf
http://repository.mercubuana.ac.id/53530/13/13.BAB%20VI.pdf
http://repository.mercubuana.ac.id/53530/14/14.BAB%20VII.pdf
http://repository.mercubuana.ac.id/53530/15/15.BAB%20VIII.pdf
http://repository.mercubuana.ac.id/53530/16/16.%20DAFTAR%20PUSTAKA.pdf
http://repository.mercubuana.ac.id/53530/17/17.LAMPIRAN.pdf
http://repository.mercubuana.ac.id/53530/
Daftar Isi:
  • Infrastructure development project toll road Depok – Antasari stage-2 connecting segments brigif - sawangan with the length of the road is 6,265 km, early work on sta. 05+775.247 to 12+040. This practical work report discusses about Work Implementation Bridge Structure With Secant Pile Method using bore pile diameter 80 cm which depth average is 18 m ~ 8 m. Secant pile method choosen because can speed up the construction period and make it easier work implementation on field with secant pile. Key word : Practical Work, Work Implementation Bridge Structure With Secant Pile Method on Project Toll Depok - Antasari Proyek pembangunan insfrastruktur Tol Depok – Antasari tahap-2 yang menghubungkan ruas brigif - sawangan dengan panjang jalan 6,265 km, awal pekerjaan pada sta. 05+775.247 s/d 12+040. Laporan Kerja Pratik ini membahas tentang Pelaksanaan Pekerjaan Struktur Jembatan Metode Secant Pile dengan bore pile diameter 80 cm yang rata-rata kedalaman 18 m ~ 8 m. Metode secant pile dipilih karena dapat mempercepat masa kontruksi serta mempermudah metode pelaksanaan di lapangan dengan secant pile. Kata kunci : Kerja Praktek, Pelaksanaan Pekerjaan Struktur Jembatan Metode Secant Pile Proyek Tol Depok - Antasari