Skip to content
Toggle navigation
Tentang IOS
Join Us
Hubungi Kami
Organisasi Mitra
Akun Anda
Keluar
Masuk
Bahasa Indonesia
Bahasa Indonesia
English
Semua Kolom
Judul
Pengarang
Subject
Call Number
ISBN/ISSN
Tag
Cari
Lanjutan
METODE PELAKSANAAN PEKERJAAN K...
Preview
Koleksi Nasional
Sitasi Cantuman
Kirim via Email
Ekspor Cantuman
Export to RefWorks
Export to EndNoteWeb
Export to EndNote
Favorit
METODE PELAKSANAAN PEKERJAAN KOLOM PADA PROYEK MPP OFFICE BUILDING
Tersimpan di:
Main Author:
KRISTIAWAN, PRASETYO
Format:
Thesis
NonPeerReviewed
Book
Bahasa:
ind
Terbitan:
,
2019
Subjects:
022.3 Buildings
Bangunan
069.22 Planning for Buildings
Merencanakan Bangunan
620 Engineering and Applied Operations
Ilmu Teknik dan operasi Terapan
624 Civil Engineering
Teknik Sipil
624.9 Building
Structure
and Installation/Bangunan
Struktur
dan Instalasi
Online Access:
http://repository.mercubuana.ac.id/52711/1/COVER.pdf
http://repository.mercubuana.ac.id/52711/2/ABSTRAK.pdf
http://repository.mercubuana.ac.id/52711/3/SURAT%20PERNYATAAN%20PRASETYO.pdf
http://repository.mercubuana.ac.id/52711/4/LEMBAR%20PENGESAHAN.pdf
http://repository.mercubuana.ac.id/52711/5/KATA%20PENGANTAR.pdf
http://repository.mercubuana.ac.id/52711/6/DAFTAR%20ISI.pdf
http://repository.mercubuana.ac.id/52711/7/DAFTAR%20GAMBAR.pdf
http://repository.mercubuana.ac.id/52711/8/BAB%20I%20PENDAHULUAN.pdf
http://repository.mercubuana.ac.id/52711/9/BAB%20II%20DATA%20PROYEK.pdf
http://repository.mercubuana.ac.id/52711/10/BAB%20III%20SISTEM%20ORGANISASI%20DAN%20MANAJEMEN%20PROYEK.pdf
http://repository.mercubuana.ac.id/52711/11/BAB%20IV%20TUJUAN%20BAHAN%20BANGUNAN%20DAN%20ALAT-ALAT.pdf
http://repository.mercubuana.ac.id/52711/12/BAB%20V%20PELAKSANAAN%20PEKERJAAN.pdf
http://repository.mercubuana.ac.id/52711/13/BAB%20VI%20KEMAJUAN%20PEKERJAAN%20DAN%20PENGENDALIAN%20PROYEK.pdf
http://repository.mercubuana.ac.id/52711/14/BAB%20VII%20TINJAUAN%20KHUSUS.pdf
http://repository.mercubuana.ac.id/52711/15/BAB%20VIII%20KESIMPULAN%20DAN%20SARAN.pdf
http://repository.mercubuana.ac.id/52711/16/DAFTAR%20PUSTAKA.pdf
http://repository.mercubuana.ac.id/52711/17/LAMPIRAN.pdf
http://repository.mercubuana.ac.id/52711/
Lokasi
Deskripsi
Daftar Isi
Preview
Tampilan Petugas
Lihat Juga
METODE PELAKSANAAN PEKERJAAN KOLOM PADA PROYEK MPP OFFICE BUILDING
oleh: HALIM, DRIWANSYAH EKO
Terbitan: (2019)
EVALUASI PEKERJAAN INSTALASI FASAD CURTAIN WALL UNITIZED SYSTEM PADA BANGUNAN TWIST BUILDING DENGAN METODE OPERASI KONSTRUKSI BERULANG (CYCLONE) (Studi Kasus : Proyek Avian Tower Surabaya)
oleh: ADRIYATNO, JIMMY
Terbitan: (2018)
METODE PEKERJAAN KOLOM BALOK DAN PELAT LANTAI UNTUK BANGUNAN MALL BERTINGKAT DI PROYEK FAMILLY ENTERTAIMENT CENTER TAMAN RIA SENAYAN
oleh: PRATAMA, IKHSAN DIKA
Terbitan: (2018)
METODE PEKERJAAN BALOK DAN PELAT LANTAI UNTUK BANGUNAN PROYEK OFFICE TOWER 2 CIPUTRA INTERNATIONAL – JAKARTA BARAT
oleh: FIRDAUS, M.
Terbitan: (2020)
METODE PELAKSANAAN PEKERJAAN DROP PANEL PADA PROYEK OFFICE CIPUTRA INTERNATIONAL TOWER 2
oleh: HADI, TOMMI PRASTYA
Terbitan: (2019)
×
Loading...