Skip to content
Toggle navigation
Tentang IOS
Join Us
Hubungi Kami
Organisasi Mitra
Akun Anda
Keluar
Masuk
Bahasa Indonesia
Bahasa Indonesia
English
Semua Kolom
Judul
Pengarang
Subject
Call Number
ISBN/ISSN
Tag
Cari
Lanjutan
METODE PELAKSANAAN PEKERJAAN B...
Preview
Koleksi Nasional
Sitasi Cantuman
Kirim via Email
Ekspor Cantuman
Export to RefWorks
Export to EndNoteWeb
Export to EndNote
Favorit
METODE PELAKSANAAN PEKERJAAN BORED PILE PROYEK DASWIN OFFICE TOWER JAKARTA
Tersimpan di:
Main Author:
PRATAMA, FREZA HADI
Format:
Thesis
NonPeerReviewed
Book
Bahasa:
ind
Terbitan:
,
2019
Subjects:
022.3 Buildings
Bangunan
069.22 Planning for Buildings
Merencanakan Bangunan
620 Engineering and Applied Operations
Ilmu Teknik dan operasi Terapan
624 Civil Engineering
Teknik Sipil
624.9 Building
Structure
and Installation/Bangunan
Struktur
dan Instalasi
690 Buildings
Teknik Bangunan
690.1 Structural Elements
Struktur Bahan Dasar Teknik Bangunan
690.1-690.9 Standard Subdivisions of Planning
Anaysis
Engineering Design/Subdivisi Standar Dari Perencanaan
Analisa dan Teknik Bangunan
Online Access:
http://repository.mercubuana.ac.id/49191/1/1.%20COVER.pdf
http://repository.mercubuana.ac.id/49191/2/3.%20ABSTRAK.pdf
http://repository.mercubuana.ac.id/49191/3/Surst%20Pernyataan%20Freza.pdf
http://repository.mercubuana.ac.id/49191/4/2%20Lembar%20pengesahan.pdf
http://repository.mercubuana.ac.id/49191/5/4.%20KATA%20PENGANTAR.pdf
http://repository.mercubuana.ac.id/49191/6/5.%20DAFTAR%20ISI.pdf
http://repository.mercubuana.ac.id/49191/7/6.%20DAFTAR%20TABEL.pdf
http://repository.mercubuana.ac.id/49191/8/7.%20DAFTAR%20GAMBAR.pdf
http://repository.mercubuana.ac.id/49191/9/8.%20BAB%201.pdf
http://repository.mercubuana.ac.id/49191/10/9.%20BAB%202.pdf
http://repository.mercubuana.ac.id/49191/11/10.%20BAB%203.pdf
http://repository.mercubuana.ac.id/49191/12/11.%20BAB%204.pdf
http://repository.mercubuana.ac.id/49191/13/12.%20BAB%205.pdf
http://repository.mercubuana.ac.id/49191/14/13.%20BAB%206.pdf
http://repository.mercubuana.ac.id/49191/15/14.%20BAB%207.pdf
http://repository.mercubuana.ac.id/49191/16/15.%20BAB%208.pdf
http://repository.mercubuana.ac.id/49191/17/18.%20DAFTAR%20PUSTAKA.pdf
http://repository.mercubuana.ac.id/49191/18/19.%20LAMPIRAN%20LAPORAN%20KP.pdf
http://repository.mercubuana.ac.id/49191/
Lokasi
Deskripsi
Daftar Isi
Preview
Tampilan Petugas
Lihat Juga
METODE PELAKSANAAN PEKERJAAN BORED PILE PADA PROYEK PASIFIC GARDEN STYLE
oleh: N, PRADANA BAYU S
Terbitan: (2018)
METODE PELAKSANAAN PEKERJAAN BORED PILE PROYEK THE COLLINS BOULEVARD SERPONG
oleh: DWIMULYO, GUNAWAN
Terbitan: (2019)
METODE PELAKSANAAN PEKERJAAN BORED PILE PADA PROYEK PASIFIC GARDEN STYLE
oleh: BIHALALIKA, PANDHUM
Terbitan: (2018)
METODE PELAKSANAAN BORE PILE PADA PROYEK DHARMAWANGSA TOWER JAKARTA
oleh: YOGATAMA, ARIF
Terbitan: (2020)
METODE PEKERJAAN BALOK DAN PELAT LANTAI UNTUK BANGUNAN BERTINGKAT TOWER 3 PROYEK THE ASPEN PEAK RESIDENCES
oleh: TRIYADANA, NURHADI
Terbitan: (2018)
×
Loading...