Skip to content
Toggle navigation
Tentang IOS
Join Us
Hubungi Kami
Organisasi Mitra
Akun Anda
Keluar
Masuk
Bahasa Indonesia
Bahasa Indonesia
English
Semua Kolom
Judul
Pengarang
Subject
Call Number
ISBN/ISSN
Tag
Cari
Lanjutan
Cari
PELAKSANAAN PEKERJAAN KONSTRUK...
Deskripsi
Koleksi Nasional
Sitasi Cantuman
Kirim via Email
Ekspor Cantuman
Export to RefWorks
Export to EndNoteWeb
Export to EndNote
Favorit
PELAKSANAAN PEKERJAAN KONSTRUKSI BORE PILE DAN METODE PENGUJIANNYA PROYEK APARTEMEN EMERALD BINTARO JAYA
Tersimpan di:
Main Author:
ALIFIAN, RIZAL WAHYU
Format:
Thesis
NonPeerReviewed
Book
Bahasa:
ind
Terbitan:
,
2019
Subjects:
620 Engineering and Applied Operations
Ilmu Teknik dan operasi Terapan
624 Civil Engineering
Teknik Sipil
624.1 Structural Engineering and Underground Construction
Teknik Struktural dan Konstruksi Bawah Tanah
658.9 Construction Management
Manajemen Konstruksi
721 Architectural Structure
Struktur Arsitektur
721.3 Columnar Constructions
Konstruksi Tiang dan Pilar
Online Access:
http://repository.mercubuana.ac.id/49152/1/1_%20cover%20judul.pdf
http://repository.mercubuana.ac.id/49152/2/5_abstrak.pdf
http://repository.mercubuana.ac.id/49152/3/3_Lembar%20pernyataan.pdf
http://repository.mercubuana.ac.id/49152/4/2_Lembar%20Pengesahan.pdf
http://repository.mercubuana.ac.id/49152/5/6_kata%20pengantar.pdf
http://repository.mercubuana.ac.id/49152/6/7_Daftar%20Isii.pdf
http://repository.mercubuana.ac.id/49152/7/9_DAFTAR%20TABEL.pdf
http://repository.mercubuana.ac.id/49152/8/8_DAFTAR%20GAMBAR.pdf
http://repository.mercubuana.ac.id/49152/9/11_BAB%20I%20-%20PENDAHULUAN.pdf
http://repository.mercubuana.ac.id/49152/10/12_BAB%20II%20-%20DATA%20UMUM%20PROYEK.pdf
http://repository.mercubuana.ac.id/49152/11/13_BAB%20III%20-STRUKTUR%20ORGANISASI%20DAN%20MANAJEMEN%20PROYEK.pdf
http://repository.mercubuana.ac.id/49152/12/14_BAB%20IV%20-%20TINJAUAN%20MATERIAL%20DAN%20ALAT-ALAT.pdf
http://repository.mercubuana.ac.id/49152/13/15_BAB%20V%20-%20PELAKSANAAN%20PEKERJAAN.pdf
http://repository.mercubuana.ac.id/49152/14/16_BAB%20VI%20-%20PENGENDALIAN%20DAN%20KEMAJUAN%20PROYEK.pdf
http://repository.mercubuana.ac.id/49152/15/17_BAB%20VII%20-%20TINJAUAN%20KHUSUS.pdf
http://repository.mercubuana.ac.id/49152/16/18_BAB%20VIII%20-%20KESIMPULAN%20DAN%20SARAN.pdf
http://repository.mercubuana.ac.id/49152/17/20_DAFTAR%20PUSTAKA.pdf
http://repository.mercubuana.ac.id/49152/18/19_LAMPIRAN.pdf
http://repository.mercubuana.ac.id/49152/
Lokasi
Deskripsi
Daftar Isi
Preview
Tampilan Petugas
Description not available.
Lihat Juga
PELAKSANAAN PEKERJAAN KONSTRUKSI BORE PILE DAN METODE PENGUJIANNYA PROYEK APARTEMEN EMERALD BINTARO JAYA
oleh: REHMAWAN, MAHMUT IBNU
Terbitan: (2019)
Analisa Faktor-Faktor Yang Mempengaruhi Kinerja Sumber Daya Manusia Dalam Pelaksanaan Pekerjaan Bekisting Semi Modern Pada Konstruksi Bangunan Gedung
oleh: Suprabowo, TeguhSetiawan
Terbitan: (2015)
PELAKSANAAN KONSTRUKSI PROYEK PEMBANGUNAN PRASARANA KERETA API LIGHT RAIL TRANSIT LINTAS TAMAN MINI - CIBUBUR
oleh: SETIAWAN, DANIEL
Terbitan: (2019)
PROYEK PEKERJAAN KONSTRUKSI PEMBANGUNAN GEDUNG ASEAN SECRETARIAT (ASEC)
oleh: GINANJAR, YUSUP
Terbitan: (2019)
PROYEK PEKERJAAN KONSTRUKSI PEMBANGUNAN GEDUNG ASEAN SECRETARIAT (ASEC)
oleh: WAHYUDI, DIKI
Terbitan: (2019)
×
Loading...