METODE PELAKSANAAN PENGECORAN PEKERJAAN PILE CAP PROYEK TRANSPARK BINTARO
ctrlnum |
49070 |
---|---|
fullrecord |
<?xml version="1.0"?>
<dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://repository.mercubuana.ac.id/49070/</relation><title>METODE PELAKSANAAN PENGECORAN PEKERJAAN PILE CAP PROYEK TRANSPARK BINTARO</title><creator>MARDOTILLAH, DODI</creator><subject>022.3 Buildings/Bangunan</subject><subject>069.22 Planning for Buildings/Merencanakan Bangunan</subject><subject>620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan</subject><subject>624 Civil Engineering/Teknik Sipil</subject><subject>624.9 Building, Structure, and Installation/Bangunan, Struktur, dan Instalasi</subject><subject>690 Buildings/Teknik Bangunan</subject><subject>690.1 Structural Elements/Struktur Bahan Dasar Teknik Bangunan</subject><subject>690.1-690.9 Standard Subdivisions of Planning, Anaysis, Engineering Design/Subdivisi Standar Dari Perencanaan, Analisa dan Teknik Bangunan</subject><description>Judul : Metode pelaksanaan Pengecoran Pekerjaan Pile Cap pada Proyek
Transpark Bintaro, Tangerang Selatan, Nama : Dodi Mardotillah , Nim :
41115110027, Dosen Pembimbing : Kukuh Mahi ST, MT, 2018
Tangsel merupakan kota yang sedang berkembang saat ini, pembanguan Struktur
dan Infrastruktur terjadi di berbagai daerah, salah satunya di Bintaro.
Pembangunan hunian yang modern menjadikan daya tarik sendiri bagi calon
pembeli / penyewa , karena difasilitasi dengan adanya taman bermain, Mall dan
Lahan parkir. Berdasarkan data yang ada, gedung yang dibangun terdapat 3 tower
dan 3 basement dengan total ketinggain +141 m
Dalam kerja praktik yang penulis lakukan pada proyek Transpark Bintaro praktik
meninjau pelaksanaan pengecoran pekerjaan pile cap yang berisi tentang ,
pekerjaan galian tanah, pembesian tulangan pile cap, pemasangan bekisting,
sampai pengecoran Mass Foundation.
Mass Foundation adalah segala volume beton dengan dimensi yang cukup besar
sehingga perlu pengendalian Thermal terhadap panas yang ditimbulkan oleh
proses hidrasi semen.
Pada saat tinjauan khusus, yang pertama akan dibahas jumlah volume beton yang
akan dicor, jalur pengecoran , zoning pengecoran dan perawatan setelah
pengecoran.
Kata kunci : Transpark Bintaro, Pile cap, Mass Foundation</description><date>2019-06-24</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/49070/1/00%20COVER.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/49070/2/ABSTRAK.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/49070/3/LEMBAR%20PERNYATAAN.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/49070/4/LEMBAR%20PENGESAHAN.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/49070/5/KATA%20PENGANTAR.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/49070/6/DAFTAR%20ISI.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/49070/7/DAFTAR%20TABEL.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/49070/8/DAFTAR%20GAMBAR.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/49070/9/01%20BAB%20I%20PENDAHULUAN.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/49070/10/02%20BAB%20II%20TINJAUAN%20UMUM%20PROYEK.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/49070/11/03%20BAB%20III%20SISTEM%20ORGANISASI.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/49070/12/04%20BAB%20IV%20MATERIAL%20DAN%20ALAT.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/49070/13/05%20BAB%20V%20PELAKSANAAN%20KONSTRUKSI.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/49070/14/06%20BAB%20VI%20KEMAJUAN%20PROYEK.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/49070/15/07%20BAB%20VII%20TINJAUAN%20KHUSUS.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/49070/16/08%20BAB%20VIII%20KESIMPULAN.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/49070/17/DAFTAR%20PUSTAKA.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/49070/18/LAMPIRAN-LAMPIRAN.pdf</identifier><identifier> MARDOTILLAH, DODI (2019) METODE PELAKSANAAN PENGECORAN PEKERJAAN PILE CAP PROYEK TRANSPARK BINTARO. S1 thesis, Universitas Mercu Buana Jakarta. </identifier><recordID>49070</recordID></dc>
|
language |
ind |
format |
Thesis:Thesis Thesis PeerReview:NonPeerReviewed PeerReview Book:Book Book |
author |
MARDOTILLAH, DODI |
title |
METODE PELAKSANAAN PENGECORAN PEKERJAAN PILE CAP PROYEK TRANSPARK BINTARO |
publishDate |
2019 |
topic |
022.3 Buildings Bangunan 069.22 Planning for Buildings Merencanakan Bangunan 620 Engineering and Applied Operations Ilmu Teknik dan operasi Terapan 624 Civil Engineering Teknik Sipil 624.9 Building Structure and Installation/Bangunan Struktur dan Instalasi 690 Buildings Teknik Bangunan 690.1 Structural Elements Struktur Bahan Dasar Teknik Bangunan 690.1-690.9 Standard Subdivisions of Planning Anaysis Engineering Design/Subdivisi Standar Dari Perencanaan Analisa dan Teknik Bangunan |
url |
http://repository.mercubuana.ac.id/49070/1/00%20COVER.pdf http://repository.mercubuana.ac.id/49070/2/ABSTRAK.pdf http://repository.mercubuana.ac.id/49070/3/LEMBAR%20PERNYATAAN.pdf http://repository.mercubuana.ac.id/49070/4/LEMBAR%20PENGESAHAN.pdf http://repository.mercubuana.ac.id/49070/5/KATA%20PENGANTAR.pdf http://repository.mercubuana.ac.id/49070/6/DAFTAR%20ISI.pdf http://repository.mercubuana.ac.id/49070/7/DAFTAR%20TABEL.pdf http://repository.mercubuana.ac.id/49070/8/DAFTAR%20GAMBAR.pdf http://repository.mercubuana.ac.id/49070/9/01%20BAB%20I%20PENDAHULUAN.pdf http://repository.mercubuana.ac.id/49070/10/02%20BAB%20II%20TINJAUAN%20UMUM%20PROYEK.pdf http://repository.mercubuana.ac.id/49070/11/03%20BAB%20III%20SISTEM%20ORGANISASI.pdf http://repository.mercubuana.ac.id/49070/12/04%20BAB%20IV%20MATERIAL%20DAN%20ALAT.pdf http://repository.mercubuana.ac.id/49070/13/05%20BAB%20V%20PELAKSANAAN%20KONSTRUKSI.pdf http://repository.mercubuana.ac.id/49070/14/06%20BAB%20VI%20KEMAJUAN%20PROYEK.pdf http://repository.mercubuana.ac.id/49070/15/07%20BAB%20VII%20TINJAUAN%20KHUSUS.pdf http://repository.mercubuana.ac.id/49070/16/08%20BAB%20VIII%20KESIMPULAN.pdf http://repository.mercubuana.ac.id/49070/17/DAFTAR%20PUSTAKA.pdf http://repository.mercubuana.ac.id/49070/18/LAMPIRAN-LAMPIRAN.pdf http://repository.mercubuana.ac.id/49070/ |
contents |
Judul : Metode pelaksanaan Pengecoran Pekerjaan Pile Cap pada Proyek
Transpark Bintaro, Tangerang Selatan, Nama : Dodi Mardotillah , Nim :
41115110027, Dosen Pembimbing : Kukuh Mahi ST, MT, 2018
Tangsel merupakan kota yang sedang berkembang saat ini, pembanguan Struktur
dan Infrastruktur terjadi di berbagai daerah, salah satunya di Bintaro.
Pembangunan hunian yang modern menjadikan daya tarik sendiri bagi calon
pembeli / penyewa , karena difasilitasi dengan adanya taman bermain, Mall dan
Lahan parkir. Berdasarkan data yang ada, gedung yang dibangun terdapat 3 tower
dan 3 basement dengan total ketinggain +141 m
Dalam kerja praktik yang penulis lakukan pada proyek Transpark Bintaro praktik
meninjau pelaksanaan pengecoran pekerjaan pile cap yang berisi tentang ,
pekerjaan galian tanah, pembesian tulangan pile cap, pemasangan bekisting,
sampai pengecoran Mass Foundation.
Mass Foundation adalah segala volume beton dengan dimensi yang cukup besar
sehingga perlu pengendalian Thermal terhadap panas yang ditimbulkan oleh
proses hidrasi semen.
Pada saat tinjauan khusus, yang pertama akan dibahas jumlah volume beton yang
akan dicor, jalur pengecoran , zoning pengecoran dan perawatan setelah
pengecoran.
Kata kunci : Transpark Bintaro, Pile cap, Mass Foundation |
id |
IOS5909.49070 |
institution |
Universitas Mercu Buana |
institution_id |
134 |
institution_type |
library:university library |
library |
Perpustakaan Universitas Mercu Buana |
library_id |
542 |
collection |
Repository Universitas Mercu Buana |
repository_id |
5909 |
subject_area |
Econmics/Ilmu Ekonomi Communication/Komunikasi Engineering/Ilmu Teknik Measurement/Teknik Desain, Pengujian, Pengukuran, Kualitas, Perawatan, Pemeliharaan, Perbaikan |
city |
Jakarta Barat |
province |
DKI JAKARTA |
shared_to_ipusnas_str |
1 |
repoId |
IOS5909 |
first_indexed |
2019-08-02T01:19:42Z |
last_indexed |
2019-08-02T01:19:42Z |
recordtype |
dc |
_version_ |
1674510810655752192 |
score |
17.538404 |