fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://repository.mercubuana.ac.id/44260/</relation><title>OPTIMALISASI WAKTU PERBAIKAN KEBOCORAN TUBE PADA HIGH PRESSURE HEATER PLTU 2 BANTEN LABUAN DI PT PLN (Persero) PUSHARLIS UWP 1 MERAK</title><creator>ARDIANTO, JEPRIS KANDO EKA</creator><subject>530 Physics/Fisika</subject><subject>537 Electricity/Fisika Listrik</subject><subject>537.6 Electrodinamics, Electric Current/Elektrodinamik, Arus Listrik</subject><description>PT PLN (Persero) PUSHARLIS UWP I Merak produces various parts of PLTU, PLTGU, PLTD, PLTA with reverse engineering (RE) method, as well as small-scale hydropower engineering, procurement and construction (EPC) . High Pressure Heater, is one of the components in the Steam Power Center (PLTU). High Pressure Heater serves to raise the temperature gradually or as a further heater of water before entering the boiler. At one time there would be a decrease in the performance of the work of the High Pressure Heater, which ultimately decreases the thermal efficiency of the power plant cycle and even the generator system will often be disturbed, as happened in PLTU 2 BANTEN LABUAN. The most common damage is leakage from the tube. The author feels in doing the repair process takes a long time. This is due to aspects of equipment, labor, work planning, and workmanship procedures.&#xD; Keywords: High Pressure Heater, optimizing repair time&#xD; &#xD; PT PLN (Persero) PUSHARLIS UWP I Merak memproduksi bermacam - macam komponen suku cadang pembangkitan PLTU, PLTGU, PLTD, PLTA dengan metode reverse engineering (RE), serta engineering, procurement dan construction (EPC) Pembangkit Listrik Tenaga Air (PLTA) skala kecil. High Pressure Heater, merupakan salah satu komponen pada Pusat Listrik Tenaga Uap (PLTU). High Pressure Heater berfungsi untuk menaikkan temperatur secara bertahap atau sebagai pemanas lanjut dari air sebelum masuk ke boiler. Suatu saat pasti akan terjadi penurunan performa kerja dari High Pressure Heater, yang akhirnya menurunkan efisiensi thermal dari siklus PLTU bahkan sistem pembangkit akan sering terganggu, seperti halnya yang terjadi di PLTU 2 BANTEN LABUAN. Kerusakan yang sering terjadi adalah kebocoran dari tube- tube. Penulis merasa di dalam melakukan proses perbaikan tersebut membutuhkan waktu yang lama. Hal ini disebabkan dari aspek peralatan, tenaga kerja, perencanaan kerja, dan prosedur pengerjaan.&#xD; Kata Kunci: High Pressure Heater, optimalisasi waktu perbaikan</description><date>2018-08-28</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/44260/1/2.%20Halaman%20Judul.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/44260/2/3.%20Abstrak.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/44260/3/4.%20Lembar%20Pernyataan.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/44260/4/5.%20Lembar%20Pengesahan.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/44260/5/6.%20Penghargaan.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/44260/6/7.%20Daftar%20Isi.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/44260/7/8.%20Daftar%20Gambar.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/44260/8/9.%20Daftar%20Lampiran.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/44260/9/10.%20Bab%201.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/44260/10/11.%20Bab%202.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/44260/11/12.%20Bab%203.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/44260/12/13.%20Bab%204.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/44260/13/14.%20Bab%205.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/44260/14/15.%20Daftar%20Pustaka.pdf</identifier><type>Book:Book</type><language>ind</language><identifier>http://repository.mercubuana.ac.id/44260/15/16.%20Lampiran.pdf</identifier><identifier> ARDIANTO, JEPRIS KANDO EKA (2018) OPTIMALISASI WAKTU PERBAIKAN KEBOCORAN TUBE PADA HIGH PRESSURE HEATER PLTU 2 BANTEN LABUAN DI PT PLN (Persero) PUSHARLIS UWP 1 MERAK. S1 thesis, Universitas Mercu Buana Jakarta. </identifier><recordID>44260</recordID></dc>
language ind
format Thesis:Thesis
Thesis
PeerReview:NonPeerReviewed
PeerReview
Book:Book
Book
author ARDIANTO, JEPRIS KANDO EKA
title OPTIMALISASI WAKTU PERBAIKAN KEBOCORAN TUBE PADA HIGH PRESSURE HEATER PLTU 2 BANTEN LABUAN DI PT PLN (Persero) PUSHARLIS UWP 1 MERAK
publishDate 2018
topic 530 Physics
Fisika
537 Electricity
Fisika Listrik
537.6 Electrodinamics
Electric Current/Elektrodinamik
Arus Listrik
url http://repository.mercubuana.ac.id/44260/1/2.%20Halaman%20Judul.pdf
http://repository.mercubuana.ac.id/44260/2/3.%20Abstrak.pdf
http://repository.mercubuana.ac.id/44260/3/4.%20Lembar%20Pernyataan.pdf
http://repository.mercubuana.ac.id/44260/4/5.%20Lembar%20Pengesahan.pdf
http://repository.mercubuana.ac.id/44260/5/6.%20Penghargaan.pdf
http://repository.mercubuana.ac.id/44260/6/7.%20Daftar%20Isi.pdf
http://repository.mercubuana.ac.id/44260/7/8.%20Daftar%20Gambar.pdf
http://repository.mercubuana.ac.id/44260/8/9.%20Daftar%20Lampiran.pdf
http://repository.mercubuana.ac.id/44260/9/10.%20Bab%201.pdf
http://repository.mercubuana.ac.id/44260/10/11.%20Bab%202.pdf
http://repository.mercubuana.ac.id/44260/11/12.%20Bab%203.pdf
http://repository.mercubuana.ac.id/44260/12/13.%20Bab%204.pdf
http://repository.mercubuana.ac.id/44260/13/14.%20Bab%205.pdf
http://repository.mercubuana.ac.id/44260/14/15.%20Daftar%20Pustaka.pdf
http://repository.mercubuana.ac.id/44260/15/16.%20Lampiran.pdf
http://repository.mercubuana.ac.id/44260/
contents PT PLN (Persero) PUSHARLIS UWP I Merak produces various parts of PLTU, PLTGU, PLTD, PLTA with reverse engineering (RE) method, as well as small-scale hydropower engineering, procurement and construction (EPC) . High Pressure Heater, is one of the components in the Steam Power Center (PLTU). High Pressure Heater serves to raise the temperature gradually or as a further heater of water before entering the boiler. At one time there would be a decrease in the performance of the work of the High Pressure Heater, which ultimately decreases the thermal efficiency of the power plant cycle and even the generator system will often be disturbed, as happened in PLTU 2 BANTEN LABUAN. The most common damage is leakage from the tube. The author feels in doing the repair process takes a long time. This is due to aspects of equipment, labor, work planning, and workmanship procedures. Keywords: High Pressure Heater, optimizing repair time PT PLN (Persero) PUSHARLIS UWP I Merak memproduksi bermacam - macam komponen suku cadang pembangkitan PLTU, PLTGU, PLTD, PLTA dengan metode reverse engineering (RE), serta engineering, procurement dan construction (EPC) Pembangkit Listrik Tenaga Air (PLTA) skala kecil. High Pressure Heater, merupakan salah satu komponen pada Pusat Listrik Tenaga Uap (PLTU). High Pressure Heater berfungsi untuk menaikkan temperatur secara bertahap atau sebagai pemanas lanjut dari air sebelum masuk ke boiler. Suatu saat pasti akan terjadi penurunan performa kerja dari High Pressure Heater, yang akhirnya menurunkan efisiensi thermal dari siklus PLTU bahkan sistem pembangkit akan sering terganggu, seperti halnya yang terjadi di PLTU 2 BANTEN LABUAN. Kerusakan yang sering terjadi adalah kebocoran dari tube- tube. Penulis merasa di dalam melakukan proses perbaikan tersebut membutuhkan waktu yang lama. Hal ini disebabkan dari aspek peralatan, tenaga kerja, perencanaan kerja, dan prosedur pengerjaan. Kata Kunci: High Pressure Heater, optimalisasi waktu perbaikan
id IOS5909.44260
institution Universitas Mercu Buana
institution_id 134
institution_type library:university
library
library Perpustakaan Universitas Mercu Buana
library_id 542
collection Repository Universitas Mercu Buana
repository_id 5909
subject_area Econmics/Ilmu Ekonomi
Communication/Komunikasi
Engineering/Ilmu Teknik
Measurement/Teknik Desain, Pengujian, Pengukuran, Kualitas, Perawatan, Pemeliharaan, Perbaikan
city Jakarta Barat
province DKI JAKARTA
shared_to_ipusnas_str 1
repoId IOS5909
first_indexed 2019-05-09T00:33:17Z
last_indexed 2019-05-09T00:33:17Z
recordtype dc
_version_ 1674510777048891392
score 17.538404