STUDI KOMPARATIF PENJADWALAN PROYEK KONSTRUKSI REPETITIF MENGGUNAKAN METODE PENJADWALAN BERULANG (RSM) DAN METODE DIAGRAM PRESEDEN (PDM)
Main Author: | Laksito, Budi |
---|---|
Format: | Article PeerReviewed application/pdf |
Terbitan: |
MEDIA TEKNIK SIPIL
, 2016
|
Subjects: | |
Online Access: |
http://eprints.uns.ac.id/1032/1/7%2D28%2D1%2DPB.pdf http://eprints.uns.ac.id/1032/ |
Daftar Isi:
- Repetitive project activities require scheduling instrument which can facilitate unbreakable resources flow from one to the next unit. CPM which has been widely recognized as a tough project scheduling method to handle complex and has many branchesl networks, apparently become less effective if we used it to schedule repetitive project. Like wise the PDM usefulness in a project relatively collided with it’s limited ability to maintain work continuity for existing worker teams.What we want to inform in this paper is introducing a new alternative method that is RSM . RSM is a method that guarantee the unbreakable resources usage, also applicable for both repetitive vertical and horizontal project. Considered from the expense of total labor fee, RSM are more cost-saving than PDM if the labor arrangement is adapted to work specialization