PREDIKSI PENURUNAN TANAH TIMBUNAN PADA PERBAIKAN TANAH LUNAK DENGAN PREFABRICATED VERTICAL DRAIN (PVD) STUDI KASUS PROYEK PELABUHAN KUALA TANJUNG, SUMATERA UTARA

Main Author: DANANG ARIFIYANTO, 03113102
Format: Thesis NonPeerReviewed Book
Bahasa: eng
Terbitan: , 2016
Subjects:
Online Access: http://repository.narotama.ac.id/103/1/Danang%20Arifianto....pdf
http://repository.narotama.ac.id/103/2/Danang%20Arifianto.pdf
http://repository.narotama.ac.id/103/
ctrlnum 103
fullrecord <?xml version="1.0"?> <dc schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd"><relation>http://repository.narotama.ac.id/103/</relation><title>PREDIKSI PENURUNAN TANAH TIMBUNAN PADA PERBAIKAN TANAH LUNAK DENGAN PREFABRICATED VERTICAL DRAIN (PVD) &#xD; STUDI KASUS : PROYEK PELABUHAN KUALA TANJUNG, SUMATERA UTARA</title><creator>DANANG ARIFIYANTO, 03113102</creator><subject>TA Engineering (General). Civil engineering (General)</subject><description>Penurunan konsolidasi (Das, 1985) merupakan permasalahan yang sering dialami pada pekerjaan kontruksi di atas tanah lunak. Konsolidasi tanah adalah peristiwa terdisipasinya air pori akibat beban yang diterima tanah diatasnya, sehingga volumenya berkurang. Penurunan yang terjadi sebagai akibat langsung dari berkurangnya volume tanah yang disebabkan mampatnya air dan keluarnya udara dari rongga akibat beban dari atas yang diterima tanah. Penurunan berlebihan dapat menyebabkan kerusakan struktur bangunan di atasnya. &#xD; Penurunan tanah pada jenis tanah lunak berlangsung dalam kurun waktu yang relatif lama, sehingga penggunaan preload dan prefabricated vertical drain (PVD) perlu diperhitungkan agar diketahui waktu yang dibutuhkan tanah untuk mencapai tekanan air pori minimum hingga tanah siap menerima beban bangunan di atasnya tanpa adanya lagi dampak penurunan. &#xD; Prediksi penurunan akhir dapat dilakukan dengan beberapa metode, salah satunya dengan observasi Metode Asaoka (1978). Metode tersebut akan digunakan dalam studi kasus ini untuk mengestimasi besar penurunan akhir dan waktu konsolidasi. Observasi Metode Asaoka juga dapat memberikan prediksi besar penurunan akhir dengan menggunakan data pengamatan penurunan akibat timbunan dengan metode curve fitting.&#xD; Dari hasil analisa menggunakan observasi Metode Asaoka , kemudian didapatkan besar penurunan akhir dan waktu konsolidasi akibat beban timbunan yang diterjadi. Dimana pada area titik sp.05 didapatkan prediksi settlement final sebesar 947mm dengan prediksi waktu konsolidasi 230 hari. Sedangkan pada area titik sp.08 didapatkan prediksi settlement final sebesar 1417mm dengan prediksi waktu konsolidasi 215 hari. Selain itu, juga didapatkan derajat konsolidasi aktual pada saat pengamatan. Dimana diperoleh U(%) sebesar 72.26% pada titik sp.05 dan diperoleh U(%) sebesar 94.00% pada titik sp.08. Sehingga dapat diketahui waktu pelaksanaan untuk tahapan selanjutnya. Dengan begitu proyek pelabuhan kuala tanjung sumatera selatan dapat berjalan dan selesai sesuai yang diharapkan.</description><date>2016</date><type>Thesis:Thesis</type><type>PeerReview:NonPeerReviewed</type><type>Book:Book</type><language>eng</language><identifier>http://repository.narotama.ac.id/103/1/Danang%20Arifianto....pdf</identifier><type>Book:Book</type><language>eng</language><identifier>http://repository.narotama.ac.id/103/2/Danang%20Arifianto.pdf</identifier><identifier> DANANG ARIFIYANTO, 03113102 (2016) PREDIKSI PENURUNAN TANAH TIMBUNAN PADA PERBAIKAN TANAH LUNAK DENGAN PREFABRICATED VERTICAL DRAIN (PVD) STUDI KASUS : PROYEK PELABUHAN KUALA TANJUNG, SUMATERA UTARA. Undergraduate thesis, Universitas Narotama. </identifier><recordID>103</recordID></dc>
language eng
format Thesis:Thesis
Thesis
PeerReview:NonPeerReviewed
PeerReview
Book:Book
Book
author DANANG ARIFIYANTO, 03113102
title PREDIKSI PENURUNAN TANAH TIMBUNAN PADA PERBAIKAN TANAH LUNAK DENGAN PREFABRICATED VERTICAL DRAIN (PVD) STUDI KASUS : PROYEK PELABUHAN KUALA TANJUNG, SUMATERA UTARA
title_sub PROYEK PELABUHAN KUALA TANJUNG, SUMATERA UTARA
publishDate 2016
topic TA Engineering (General). Civil engineering (General)
url http://repository.narotama.ac.id/103/1/Danang%20Arifianto....pdf
http://repository.narotama.ac.id/103/2/Danang%20Arifianto.pdf
http://repository.narotama.ac.id/103/
contents Penurunan konsolidasi (Das, 1985) merupakan permasalahan yang sering dialami pada pekerjaan kontruksi di atas tanah lunak. Konsolidasi tanah adalah peristiwa terdisipasinya air pori akibat beban yang diterima tanah diatasnya, sehingga volumenya berkurang. Penurunan yang terjadi sebagai akibat langsung dari berkurangnya volume tanah yang disebabkan mampatnya air dan keluarnya udara dari rongga akibat beban dari atas yang diterima tanah. Penurunan berlebihan dapat menyebabkan kerusakan struktur bangunan di atasnya. Penurunan tanah pada jenis tanah lunak berlangsung dalam kurun waktu yang relatif lama, sehingga penggunaan preload dan prefabricated vertical drain (PVD) perlu diperhitungkan agar diketahui waktu yang dibutuhkan tanah untuk mencapai tekanan air pori minimum hingga tanah siap menerima beban bangunan di atasnya tanpa adanya lagi dampak penurunan. Prediksi penurunan akhir dapat dilakukan dengan beberapa metode, salah satunya dengan observasi Metode Asaoka (1978). Metode tersebut akan digunakan dalam studi kasus ini untuk mengestimasi besar penurunan akhir dan waktu konsolidasi. Observasi Metode Asaoka juga dapat memberikan prediksi besar penurunan akhir dengan menggunakan data pengamatan penurunan akibat timbunan dengan metode curve fitting. Dari hasil analisa menggunakan observasi Metode Asaoka , kemudian didapatkan besar penurunan akhir dan waktu konsolidasi akibat beban timbunan yang diterjadi. Dimana pada area titik sp.05 didapatkan prediksi settlement final sebesar 947mm dengan prediksi waktu konsolidasi 230 hari. Sedangkan pada area titik sp.08 didapatkan prediksi settlement final sebesar 1417mm dengan prediksi waktu konsolidasi 215 hari. Selain itu, juga didapatkan derajat konsolidasi aktual pada saat pengamatan. Dimana diperoleh U(%) sebesar 72.26% pada titik sp.05 dan diperoleh U(%) sebesar 94.00% pada titik sp.08. Sehingga dapat diketahui waktu pelaksanaan untuk tahapan selanjutnya. Dengan begitu proyek pelabuhan kuala tanjung sumatera selatan dapat berjalan dan selesai sesuai yang diharapkan.
id IOS5228.103
institution Universitas Narotama
institution_id 1390
institution_type library:university
library
library perpustakaan universitas narotama
library_id 1416
collection Repository Universitas Narotama
repository_id 5228
subject_area Generalities(Karya Umum)
city KOTA SURABAYA
province JAWA TIMUR
repoId IOS5228
first_indexed 2018-03-19T19:26:38Z
last_indexed 2018-03-19T19:26:38Z
recordtype dc
_version_ 1686322055614562304
score 17.538404