PRAKTEK PEMBUATAN PRASARANA ANGKUTAN DI AREAL HUTAN RAWA SUMATRA SELATAN (The practice of in'(rastructure. construction in swamp forest areas of -South Sumatra)
Main Author: | Tinambunan, Djaban |
---|---|
Other Authors: | pusat litbang hasil hutan |
Format: | Article info application/pdf eJournal |
Bahasa: | ind |
Terbitan: |
Pusat Penelitian dan Pengembangan Hasil Hutan
, 2017
|
Online Access: |
http://ejournal.forda-mof.org/ejournal-litbang/index.php/JPHH/article/view/3451 http://ejournal.forda-mof.org/ejournal-litbang/index.php/JPHH/article/view/3451/2606 |
Daftar Isi:
- A atucly of the practice of in(rastiucture (railroads)construction in wamp forest areasof South Sumatra was carried out in 1989. The intention is to find various aspects of field operations in that specific area and their poaible con- aequencea.It ill found that aupports of rails in swamp forest areas are consisted of either 4 or 5 layers of logs. In constructing those railroads, logs used vary from 140 to 177 cu.m/km with an averageof 166 cu.m/km. Including the value of this material into calculationgives the total construction cost of railroadto the amount of around Rp 16.5 million per km.Soil diatyrbance iB found to be minimal due to narrow railroadclearingand /'lat topography. Problema identified in the field are the uceaive use of logs for railroad construction and large amount of othe- logs scattered and abandon- ed around railroadsand manual skidding (kuda-kuda) roads. It seems that there is a strong need for the government and conceaionaires to seriously pay attention and create better instructions and actions in managingthose valuable swamp (orats on a sustainable basis.