Optimalisasi Biaya Dan Waktu Pada Pelaksanaan Pekerjaan Pasangan Dinding Bata Merah Dengan Metode Time Study
Main Author: | Pramudiyanto, Andi |
---|---|
Format: | Thesis NonPeerReviewed |
Terbitan: |
, 2017
|
Subjects: | |
Online Access: |
http://repository.ub.ac.id/9267/ |