Pengoptimalan Waktu dengan Pertimbangan Biaya Proyek Konstruksi dengan Metode Time Cost Trade Off
Main Author: | Krismawanti, Denis Dwi |
---|---|
Format: | Thesis NonPeerReviewed Book |
Bahasa: | eng |
Terbitan: |
, 2017
|
Subjects: | |
Online Access: |
http://repository.ub.ac.id/2872/1/5.%20BAB%201.pdf http://repository.ub.ac.id/2872/2/6.%20BAB%20II.pdf http://repository.ub.ac.id/2872/3/7.%20BAB%20III.pdf http://repository.ub.ac.id/2872/4/8.%20BAB%20IV.pdf http://repository.ub.ac.id/2872/5/9.%20BAB%20V.pdf http://repository.ub.ac.id/2872/6/10.%20DAFTAR%20PUSTAKA.pdf http://repository.ub.ac.id/2872/7/BAGIAN%20DEPAN.pdf http://repository.ub.ac.id/2872/ |
Internet
http://repository.ub.ac.id/2872/1/5.%20BAB%201.pdfhttp://repository.ub.ac.id/2872/2/6.%20BAB%20II.pdf
http://repository.ub.ac.id/2872/3/7.%20BAB%20III.pdf
http://repository.ub.ac.id/2872/4/8.%20BAB%20IV.pdf
http://repository.ub.ac.id/2872/5/9.%20BAB%20V.pdf
http://repository.ub.ac.id/2872/6/10.%20DAFTAR%20PUSTAKA.pdf
http://repository.ub.ac.id/2872/7/BAGIAN%20DEPAN.pdf
http://repository.ub.ac.id/2872/
Lokasi
Koleksi | Repository Universitas Brawijaya |
---|---|
Gedung | Perpustakaan Universitas Brawijaya |
Institusi | Universitas Brawijaya |
Kota | MALANG |
Provinsi | JAWA TIMUR |
Kontak | Butuh informasi lebih lanjut? Hubungi pustakawan institusi ini. |