Analisis Perubahan Penjadwalan Pada Keterlambatan Proyek Dengan Menggunakan Software Ms Project (Studi Kasus Proyek Main Dam Bendungan Karian, Lebak, Banten)
Main Authors: | Yusron, Vidia Fitri Amalia, Ir. Suwanto Marsudi, MS, Dr. Eng. Evi Nur Cahya, ST., MT. |
---|---|
Format: | Thesis NonPeerReviewed Book |
Bahasa: | eng |
Terbitan: |
, 2021
|
Subjects: | |
Online Access: |
http://repository.ub.ac.id/187602/1/Vidia%20Fitri%20Amalia%20Yusron%20165060401111021.pdf http://repository.ub.ac.id/187602/ |
ISBN: |
2016506040111 |
---|